Chapter 7: Sustainability Issues and Problems (Task A3)
Comment
Sustainability Appraisal Scoping Report
Representation ID: 24688
Received: 18/10/2017
Respondent: Mr Chris Wheeler
Public transport needs to be improved and made more seamless. The East Suffolk Line can be easily be improved by dualling the section between Woodbridge and Saxmundham, or (at lower cost) by building a passing loop at Campsea Ashe. This would immediately enable an equally spaced hourly timetable, and with the new train fleet due in 2019 potentially a more frequent and higher quality timetable. This would lift the line from being useful, but a bit inconvenient, to a much more convenient choice.
Public transport needs to be improved and made more seamless. The East Suffolk Line can be easily be improved by dualling the section between Woodbridge and Saxmundham, or (at lower cost) by building a passing loop at Campsea Ashe. This would immediately enable an equally spaced hourly timetable, and with the new train fleet due in 2019 potentially a more frequent and higher quality timetable. This would lift the line from being useful, but a bit inconvenient, to a much more convenient choice.