4 - Stage C: Prepare the SA Report

Showing comments and forms 1 to 3 of 3

Support

Final Draft Ipswich Local Plan 2018 - 2036 Sustainability Appraisal Report (SEA and SA)

Representation ID: 26288

Received: 25/02/2020

Respondent: Natural England

Agent: Natural England

Representation Summary:

We are satisfied that the methodology and baseline information used to inform the report appears to meet the requirements of the SEA Directive [2001/42/EC] and associated guidance. Furthermore the final SA contains a robust assessment of the environmental effects of plan policies and allocations on statutorily designated sites and landscapes including the Orwell Estuary SPA, SSSIs and the Suffolk Coast and Heaths AONB and has taken into account both our advice and the findings of the HRA.

Change suggested by respondent:

N/A.

Attachments:

Object

Final Draft Ipswich Local Plan 2018 - 2036 Sustainability Appraisal Report (SEA and SA)

Representation ID: 26373

Received: 02/03/2020

Respondent: Save Our Country Spaces

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

SA simply assumes that CS fully implemented and full funding for all measures secured. No evidence that IBC can deliver improvements in walking, cycling and bus infrastructure, improved road infrastructure and unprecedented levels of modal shift. IBC and SCC’s record in these areas is dire. SA incomplete and underplays key issues. Needs to fully assess air quality impacts including from rail/ sea, additional road infrastructure required, re-designation of Green Rim, alternatives to HDL (and SCDC no longer needs this to meet housing target), flood risk and new sewage infrastructure. Needs to assess robustness if unprecedented levels of modal shift underachieved.

Change suggested by respondent:

Needs to fully assess air quality impacts including from rail/ sea, additional road infrastructure required, re-designation of Green Rim, alternatives to HDL (and SCDC no longer needs this to meet housing target), flood risk and new sewage infrastructure. Needs to assess robustness if unprecedented levels of modal shift underachieved.

Attachments:

Object

Final Draft Ipswich Local Plan 2018 - 2036 Sustainability Appraisal Report (SEA and SA)

Representation ID: 26501

Received: 02/03/2020

Respondent: Northern Fringe Protection Group

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

SA simply assumes that CS fully implemented and full funding for all measures secured. No evidence that IBC can deliver improvements in walking, cycling and bus infrastructure, improved road infrastructure and unprecedented levels of modal shift. IBC and SCC’s record in these areas is dire. SA incomplete and underplays key issues. Needs to fully assess air quality impacts including from rail/ sea, additional road infrastructure required, re-designation of Green Rim, alternatives to HDL (and SCDC no longer needs this to meet housing target), flood risk and new sewage infrastructure. Needs to assess robustness if unprecedented levels of modal shift underachieved.

Change suggested by respondent:

Needs to fully assess air quality impacts including from rail/ sea, additional road infrastructure required, re-designation of Green Rim, alternatives to HDL (and SCDC no longer needs this to meet housing target), flood risk and new sewage infrastructure. Needs to assess robustness if unprecedented levels of modal shift underachieved.

Attachments: