Chapter 6 - Vision and Objectives
Object
Ipswich Borough Council Local Plan Core Strategy and Policies Development Plan Document Review - Final Draft
Representation ID: 26644
Received: 02/03/2020
Respondent: Silverton Aggregates Ltd
Legally compliant? Not specified
Sound? No
Duty to co-operate? Not specified
Support the objective for housing set out in Paragraph 6.8 (2). Also agree with Point 4. that development will be directed to the central Ipswich IP-One area. recognise that, in terms of a sequential test there is no realistic alternative to locating some development in Flood Zone 3. Land north of Burrell Road is located in proximity to the Waterfront and its facilities and services. Its proposed regeneration would contribute to the regeneration of Burrell Road, and the wider IP-One Area, whilst also contributing to the attractiveness of the Waterfront.
Add land north of Burrell Road as a residential site allocation.
Object
Ipswich Borough Council Local Plan Core Strategy and Policies Development Plan Document Review - Final Draft
Representation ID: 26654
Received: 02/03/2020
Respondent: Historic England
Legally compliant? Not specified
Sound? No
Duty to co-operate? Not specified
Under paragraph 35 of the National Planning Policy Framework (‘The Framework’) we consider that this Plan is unsound as some aspects are not effective, or consistent with national policy. We have identified in detail below where we find the Plan unsound and what measures are needed to make the Plan sound. In particular we have recommended the inclusion of specific policy references for heritage assets and identified mitigation within Policies SP2 (Land Allocated for Housing), SP4 (Opportunity Sites), SP5 (Land Allocated for Employment Use), SP11 (The Waterfront), SP12 (Education Quarter), and SP13 (Portman Quarter).
Not specified