Supporting Documents and PDFs for download

Search representations

Results for Northern Fringe Protection Group search

New search New search

Object

Supporting Documents and PDFs for download

Site Allocations Interim Sustainability Appraisal - January 2014

Representation ID: 754

Received: 10/03/2014

Respondent: Northern Fringe Protection Group

Number of people: 323

Representation Summary:

Against the existing Proposals map the proposed site allocations and proposals map shows the loss of designated countryside and conservation land off Tuddenham Rd in addition to the 3 Garden Suburb sites. The loss is unacceptable and unsustainable. No assessment of the increased traffic, increased coaches, impact on the humpback bridge and adjacent road without footway and rat running on Humberdoucy Lane has been made The SA should include an assessment of the change of use of the land;why has Hyder ignored this?

Full text:

see attached

Support

Supporting Documents and PDFs for download

Core Strategy Interim Sustainability Appraisal - January 2014

Representation ID: 755

Received: 10/03/2014

Respondent: Northern Fringe Protection Group

Number of people: 323

Representation Summary:

The additional text on open spaces, green infrastructure, improved ecological networks and tree canopy cover are supported ( Para 4.2.1).

Full text:

see attached

Object

Supporting Documents and PDFs for download

Core Strategy Interim Sustainability Appraisal - January 2014

Representation ID: 756

Received: 10/03/2014

Respondent: Northern Fringe Protection Group

Number of people: 323

Representation Summary:

Hyder has failed to see the implications of changes to the CS; the removal of any PDL target is a major change. Development of the greenfield Garden Suburb will reduce development of brownfield sites which should be the priority. A suburb creates more traffic than sites near to existing employment and will therefore impact upon environmental objectives. A specific target for jobs in Ipswich not the Policy Area is also required in order to have any meaning. The implications in switching from a jobs led to a housing led strategy are huge and must be assessed.

Full text:

see attached

Object

Supporting Documents and PDFs for download

Site Allocations Interim Sustainability Appraisal - January 2014

Representation ID: 757

Received: 10/03/2014

Respondent: Northern Fringe Protection Group

Number of people: 323

Representation Summary:

Concerned that Westgates has no potential occupier, suggest more residential development here, also at Grafton Way with hotel too and at Cox Lane/Tacket St which should have a mall linking Carr St and Upper Brook St and multi-storey car park. Need for long stay car park capacity is questioned, the issue is access and cost. Increased capacity is at odds with promoting walking/cycling/park&ride. Suggested to reopen Bury Rd P&R and make long term parking short term. SA should consider impact of more short journeys on air pollution and 3 sites reviewed in light of Bury Rd P&R reopening.

Full text:

see attached

Object

Supporting Documents and PDFs for download

Site Allocations Interim Sustainability Appraisal - January 2014

Representation ID: 758

Received: 10/03/2014

Respondent: Northern Fringe Protection Group

Representation Summary:

Policy CS17 deletes reference to Park & Ride assumed to be Bury Rd but site allocations DPD proposed extension of the facility and elsewhere in the plan there is commitment to re-opening the Park & Ride. If the P & R is not to be re-opened an alternative use for the site should be identified in the site allocations. Consistency is required across the whole document. Re-opening of the Park & Ride site is supported.

Full text:

see attached

Object

Supporting Documents and PDFs for download

Site Allocations Interim Sustainability Appraisal - January 2014

Representation ID: 759

Received: 10/03/2014

Respondent: Northern Fringe Protection Group

Representation Summary:

There is inconsistency over the density of Ipswich Sports Centre Hockey pitch site, an area of 0.6ha and 30 dwellings is shown and a requirement to meet the 35dph average in Policy DM30(c), but the allocation is for 50 dph. We believe 30 dwellings is unrealistic and out of character with the neighbourhood. The hockey pitch is classified as sport provision it would need to be replaced before change of use for housing could be sanctioned; current site access is also considered inadequate. The SA must take account of these issues and reassess accordingly.

Full text:

see attached

Object

Supporting Documents and PDFs for download

Site Allocations Interim Sustainability Appraisal - January 2014

Representation ID: 760

Received: 10/03/2014

Respondent: Northern Fringe Protection Group

Representation Summary:

We believe the Council has an opportunity to improve amenity of sites near Cliff Quay for residential and employment users. The Council should aid the attractiveness of this site to developers by committing to working with Anglian Water to resolve the local odour issue. Further development in Ipswich risks worsening the problem. The SA should take account of this opportunity and recommend accordingly or if not Hyder should explain why this is not a good idea. We would like to see Hyder promote IBC generally committing to improving attractiveness of brownfield sites to developers.

Full text:

see attached

Object

Supporting Documents and PDFs for download

Site Allocations Interim Sustainability Appraisal - January 2014

Representation ID: 795

Received: 12/06/2014

Respondent: Northern Fringe Protection Group

Number of people: 323

Representation Summary:

IP256 Artificial Hockey Pitch. There is an error in the table, which shows an area of 0.6ha, an allocation of 30 dwellings and a requirement to meet DM30c. The latter specifies an average density of 35dph whereas the allocation is for 50dph. It is unrealistic and contrary to Policy DM30c to build 30 units on this site. The development would be completely out of character with the surrounding housing, and the site access is inadequate. Under DM28 the pitch would require an alternative to be provided before a change of use for housing is granted. The SA needs amending accordingly.

Full text:

See attached.

Object

Supporting Documents and PDFs for download

Site Allocations Interim Sustainability Appraisal - January 2014

Representation ID: 796

Received: 12/06/2014

Respondent: Northern Fringe Protection Group

Number of people: 323

Representation Summary:

Table 4-6: The SA needs to recognise that the plan does little to improve educational standards in existing schools; little to tackle crime in existing wards, while promoting homes without jobs; little to improve health especially for those in poor housing stock; and nothing to redevelop/improve existing sub-standard housing. It uses obsolete jobs data and forecasts far exceed historic provision. Impacts on climate change will be negative and the potential sewage issues associated with growth have not been addressed. These omissions need to be rectified as a key objective.

Full text:

See attached.

Object

Supporting Documents and PDFs for download

Site Allocations Interim Sustainability Appraisal - January 2014

Representation ID: 797

Received: 12/06/2014

Respondent: Northern Fringe Protection Group

Number of people: 323

Representation Summary:

Paragraph 4.4.2. The following recommendations are required: most recent population and employment data should be used and forecasts should be made across district boundaries; a firm jobs growth target will help focus delivery; a better balance between new jobs and homes is needed with homes built near jobs; less reliance on retail growth and better alignment with NALEP growth sectors; a PDL target should be reintroduced; water supply and sewerage should be addressed; and more should be done to improve the lives of existing residents.

Full text:

See attached.

For instructions on how to use the system and make comments, please see our help guide.