Object
Preferred Options Core Strategy and Policies Development Plan Document (DPD) Review
Representation ID: 25654
Received: 11/03/2019
Respondent: Northern Fringe Protection Group
Representation Summary:
The traffic modelling and air quality assessments for the first phases of the IGS assumed that the Upper Orwell Crossings (TUOC) would proceed and needs to be reviewed to reflect the cancellation of this project. The Planning Inspector was incorrectly advised that full funding was in place for the Crossings and they would proceed.
Full text:
See Scanned Representation