Object
Preferred Options Core Strategy and Policies Development Plan Document (DPD) Review
Representation ID: 25657
Received: 11/03/2019
Respondent: Northern Fringe Protection Group
Representation Summary:
The potential impacts of Sizewell C on the IGS and the CS have still not properly been assessed. Concerns regarding the impact of increased rail freight for Sizewell C on the Ipswich-Westerfield line in terms of air pollution, noise, operation of the level crossing and proposed pedestrian bridge.
Full text:
See Scanned Representation