Object
Preferred Options Core Strategy and Policies Development Plan Document (DPD) Review
Representation ID: 25659
Received: 11/03/2019
Respondent: Northern Fringe Protection Group
Representation Summary:
There are still no firm proposals for new sewage infrastructure that is required for the IGS and the wider Ipswich area, which need to be consulted upon and included in the Infrastructure Tables.
The effectiveness of the Core Strategy to deliver both employment and homes growth, including the IGS, could be seriously undermined by the ongoing failure to properly assess the cumulative requirement of Ipswich for wastewater infrastructure over the plan period and plan for its provision.
The three Anglian Water improvements need to be added to the Infrastructure Table.
Full text:
See Scanned Representation