Preferred Options Core Strategy and Policies Development Plan Document (DPD) Review
Representation ID: 25673
Received: 11/03/2019
Respondent: Northern Fringe Protection Group
Representation Summary:
Concerned that the development of the IGS without adequate new road infrastructure will severely impact on traffic congestion and air quality.
The Transport Assessment indicate that some form of relief road or northern bypass will be required in the north of Ipswich. This is recognised in policy ISPA2. The need for Ipswich Northern Routes to deliver IBC's CS Preferred Options needs to be more strongly reflected in the CS. The implications of the timing or non-delivery of a northern relief road need to be assessed and planned for. It should be added to tables 8A and 8B.