ipswich.gov.uk

Object

Preferred Options Core Strategy and Policies Development Plan Document (DPD) Review

Representation ID: 25756

Received: 12/03/2019

Respondent: Environment Agency

Representation Summary:

If the Water Cycle Study is updated, this should be referred to when the local plan is updated. The paragraph could be enhanced by referencing that development should be phased in line with infrastructure upgrade timescales, thus ensuring adequate waste and water infrastructure is in place to accommodate the demands from additional growth in the borough.

Full text:

see full text