ipswich.gov.uk

Object

Documents for Download

Representation ID: 25878

Received: 13/03/2019

Respondent: Save Our Country Spaces

Representation Summary:

The impacts of new sewage infrastructure that will be required to deliver the CS preferred options needs to be included in the HRA. Likewise, the impacts of the required traffic infrastructure identified by the traffic modelling to improve the road network to allow the sustainable delivery of the CS also needs to be included in the HRA. If no such assessments are included in the HRA then it needs to explain why they have been omitted.