Object
Preferred Options Core Strategy and Policies Development Plan Document (DPD) Review
Representation ID: 26003
Received: 13/03/2019
Respondent: Suffolk County Council
Representation Summary:
See appendix 5 for detailed comments. In summary it's estimated:
- Three new primary schools required at Ipswich Garden Suburb, and a secondary school.
- A new primary school on Carr Street (IP048a)
- The County needs to consider whether to expand existing schools or deliver a new primary school in the south-west.
- Land required to enable the expansion of Rose Hill Primary School (IP10a).
Envisaged that school place capacity could be provided to serve growth but would need to be reassessed based on actual quantum of growth.
The County working to consider longer term needs for post-16 education.
Full text:
See Scanned Representation.