Preferred Options Core Strategy and Policies Development Plan Document (DPD) Review

Representation ID: 26144

Received: 13/03/2019

Respondent: Clean Air Ipswich

Representation Summary:

It is proposed that during the 12 year build of Sizewell C there will be up to 1,500 HGV daily arrivals at the site. 85% of these are to come from the south, over the Orwell Bridge. This means that when the Orwell bridge closes, such as on windy days there will be 1,275 HGVs going north through Ipswich and 1,275 HGVs coming south through Ipswich.
In the information about traffic provided by EDF for the Stage 3 Sizewell C consultation there are inconsistencies. In addition there is a lack of supporting evidence such as the traffic models used.

Full text:

See scanned representation