Object
Ipswich Borough Council Local Plan Core Strategy and Policies Development Plan Document Review - Final Draft
Representation ID: 26403
Received: 02/03/2020
Respondent: Save Our Country Spaces
Legally compliant? Not specified
Sound? No
Duty to co-operate? Not specified
This needs to include the following highway schemes that SCC assumes will proceed in Ipswich in its ISPA LOCAL PLAN MODELLING Methodology Report Table 3-2 along with the dates they are required by. Without these being implemented the modelling work, and hence the CS is unsound. See 12 highways schemes listed in attached letter. This list excludes improvements to the Henley Road/Dale Hall Lane junctions with Valley Road which are required to be delivered by Crest Nicholson. Needs to be confirmed whether this infrastructure project has been included and modelled accordingly. Support the inclusion of sewage infrastructure in ISPA2.
The modelling work needs to include the highway schemes identified.