Object
Supporting Documents and PDFs for Download
Representation ID: 26491
Received: 02/03/2020
Respondent: Save Our Country Spaces
Legally compliant? No
Sound? No
Duty to co-operate? Not specified
Opening comments on SA, apply to HRA.
HRA incomplete and must address impacts of:
1. Proposed re-designation of Green Rim.
2. New sewage infrastructure required for growth.
3. Required traffic infrastructure identified by traffic modelling
4. Non-compliance of IGS AQA with DM3.
5. Emissions from rail and shipping.
If no such assessments are included in the HRA then needs to explain why. IBC’s response to the recommendations in relation to Paragraph 1.29 is not acceptable. CS needs strengthening to ensure
compliance with this recommendation especially given Green Rim redesignation. Also whether lack of S106 payments for RAMs IGS sites acceptable.
Update HRA.