Object
Ipswich Borough Council Local Plan Core Strategy and Policies Development Plan Document Review - Final Draft
Representation ID: 26493
Received: 02/03/2020
Respondent: Northern Fringe Protection Group
Legally compliant? Not specified
Sound? No
Duty to co-operate? Not specified
Objective 6:
1. Junctions/ link roads at/near capacity, not addressed. No evidence growth is sound.
2. Severe capacity issues in 2026 but no infrastructure projects in Infrastructure Tables. Especially town centre, Ipswich Garden Suburb and A1214.
3.Modelling fails to identify when junctions will reach capacity.
4. Failing to Improve Access in breach of CS5. Modal Shift assumptions too high, uncompliant with CS20.
5. CCC assumes 10% modal shift by 2050. No evidence 15% modal shift deliverable by 2026? CCC assumption should be used.
6. Existing walking/ cycling infrastructure substandard, won't enable delivery of modal shift. Need new cycling indicator.
Not specified