ipswich.gov.uk

Object

Ipswich Borough Council Local Plan Core Strategy and Policies Development Plan Document Review - Final Draft

Representation ID: 26506

Received: 02/03/2020

Respondent: Northern Fringe Protection Group

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

No firm proposals for new sewage infrastructure required for the IGS and the wider Ipswich area, which need to be consulted upon and included in the Infrastructure Tables. The 13 transport projects need to be included in the Infrastructure Tables. If any of projects aren't delivered by the required dates (which need to be identified) then the traffic modelling will be flawed as traffic flows will not have been properly assessed and the CS unsound. Evidence needed showing funding is in place for these schemes compatible with required delivery dates. Bramford Road/ Sproughton Road link road must be included.

Change suggested by respondent:

Include firm proposals for new sewage infrastructure in tables. Include 13 transport projects and dates for completion to deliver transport mitigation programme. Include Bramford Road/ Sproughton Road link Road (IP029).

Attachments: