ipswich.gov.uk

Object

Supporting Documents and PDFs for Download

Representation ID: 26539

Received: 02/03/2020

Respondent: Northern Fringe Protection Group

Legally compliant? No

Sound? No

Duty to co-operate? Not specified

Representation Summary:

Opening comments on SA, apply to HRA.
HRA incomplete and must address impacts of:
1. Proposed re-designation of Green Rim.
2. New sewage infrastructure required for growth.
3. Required traffic infrastructure identified by traffic modelling
4. Non-compliance of IGS AQA with DM3.<br> 5. Emissions from rail and shipping.
If no such assessments are included in the HRA then needs to explain why. IBC’s response to the recommendations in relation to Paragraph 1.29 is not acceptable. CS needs strengthening to ensure
compliance with this recommendation especially given Green Rim redesignation. Also whether lack of S106 payments for RAMs IGS sites acceptable.

Change suggested by respondent:

Update HRA accordingly.

Attachments: