Object
Supporting Documents and PDFs for download
Representation ID: 798
Received: 12/06/2014
Respondent: Northern Fringe Protection Group
Number of people: 323
Representation Summary:
The SA/SEA process requires an examination of the baseline information of the Borough as it is now together with data on how it may change in the future. The CS and its SA must therefore be based on the best data available, which is not the case as it fails to utilise the most recent DCLG or EEFM 2013 forecasts. Both the CS and this SA are therefore unsound.
Full text:
See attached.