ipswich.gov.uk

IP0150c - Land south of Ravenswood

Showing comments and forms 1 to 3 of 3

Object

Preferred Options Site Allocations and Policies (incorporating IP-One Area Action Plan) DPD Review

Representation ID: 25847

Received: 12/03/2019

Respondent: Ravenswood Environmental Group

Representation Summary:

The Land Adjacent to Nacton Road does not appear in the SA and the site sheet for site IP150e suggests that this site should be masterplanned with IP150c but there is no policy to insist upon it. There should be a criteria based policy stating how the site can be delivered as part of a masterplan.

Full text:

See Scanned Representation.

Object

Preferred Options Site Allocations and Policies (incorporating IP-One Area Action Plan) DPD Review

Representation ID: 26091

Received: 13/03/2019

Respondent: Suffolk County Council

Representation Summary:

Highways:
- Contrary to town centre first policy for offices.
- Site IP152 needs access most likely through a junction to the A1189 through this site.
- It does not appear that safe and sustainable access and be made to the site.
- Left-in left-out access through IP150b required to mitigate impact
- Foot way along perimeter track represents opportunity for sustainable access improvement.
- Site is likely to have a significant impact on junctions already under strain and junction (capacity) enhancements could be necessary to avoid cumulative residual severe impact.

Full text:

See Scanned Representation.

Object

Preferred Options Site Allocations and Policies (incorporating IP-One Area Action Plan) DPD Review

Representation ID: 26121

Received: 13/03/2019

Respondent: Ravenswood Residents Association

Representation Summary:

Is the Access to this B1 site for offices etc. to be via the new IP150e 126 housing development? This would need to be master planned.

The 3 phases of IP152, IP150e and Ip150c need to be coordinated and Master Planned with a second ACCESS/EGRESS point for Ravenswood, as with the existing single point of access into and out of Ravenswood already not coping at the specified times of day, then forward planning becomes an absolute must, otherwise grid-lock will come into play very rapidly.

Full text:

See Scanned Representation.