ipswich.gov.uk

Object

Preferred Options Site Allocations and Policies (incorporating IP-One Area Action Plan) DPD Review

Representation ID: 26121

Received: 13/03/2019

Respondent: Ravenswood Residents Association

Representation Summary:

Is the Access to this B1 site for offices etc. to be via the new IP150e 126 housing development? This would need to be master planned.

The 3 phases of IP152, IP150e and Ip150c need to be coordinated and Master Planned with a second ACCESS/EGRESS point for Ravenswood, as with the existing single point of access into and out of Ravenswood already not coping at the specified times of day, then forward planning becomes an absolute must, otherwise grid-lock will come into play very rapidly.

Full text:

See Scanned Representation.