Object
Preferred Options Core Strategy and Policies Development Plan Document (DPD) Review
Representation ID: 25668
Received: 11/03/2019
Respondent: Northern Fringe Protection Group
Representation Summary:
Objective 6.8.6 needs to be amended to include the requirement of a northern route around Ipswich to deliver the Local Plan and for consistency with Policy ISPA2 Strategic Infrastructure Priorities a) Ipswich Northern Routes.
Objective 6.8.7, and the rest of the Core Strategy document, needs to be updated to recognise that a new flood barrier is already in place
Full text:
See Scanned Representation.