ipswich.gov.uk

Object

Ipswich Borough Council Local Plan Core Strategy and Policies Development Plan Document Review - Final Draft

Representation ID: 26508

Received: 02/03/2020

Respondent: Northern Fringe Protection Group

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

5.25; Improving air quality in the increasing number of Ipswich AQMAs (now five) needs to be added as a key challenge. IBC should be “delivering high levels of modal shift” rather than just “guiding as many trips as possible to sustainable modes” .Meeting the Climate Emergency needs to be added as a key challenge.
5.26 - table 2 - There are inconsistent references throughout the document (6.16, IBC FRA webpage, 8.45, 8.46, 8.225, DM4 PRFA). The situation regarding flood risk assessment within the CS is confusing and makes flood risk impossible to understand for the general public. Requires further clarification.

Change suggested by respondent:

The situation regarding flood risk assessment within the CS is confusing and makes flood risk impossible to understand for the general public. Requires further clarification.

Attachments: