ipswich.gov.uk

CS10: Ipswich Garden Suburb

Showing comments and forms 901 to 930 of 1091

Object

Proposed Submission Core Strategy and Policies Development Plan Document Review

Representation ID: 22444

Received: 03/03/2015

Respondent: Mrs Susan Webb

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

It is unsound to allocate the entire Northern Fringe when its delivery may not be viable over the plan timescales. To lower this risk the CS should include a plan based on co-operating more closely with neighbouring LAs to deliver homes growth. The CS cannot guarantee delivery of the Country Park in a timely manner and so demonstrate it will not adversely affect the integrity of a European designated habitat. For soundness, policy CS10 and Infrastructure Table 8B need to be revised. Allocating the entire Northern Fringe for immediate development through multi-site starts is a high risk strategy that will result in severe traffic congestion for both North Ipswich and the town centre and will damage the future attractiveness and prosperity of town. With so few new jobs being created in the town centre, residents will have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements. In response to a planning application by Mersea Homes /CBRE Global Investors for the first phase of the Ipswich Garden Suburb, Suffolk County Council stated with regard to traffic '... the development has a severe impact on network performance and travel time.' IBC has been pinning their hopes on getting people out of their cars and onto public transport but with so few new jobs being created in the town centre, residents will mainly have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements and capacity such as a northern bypass or link road. New measures will also be required to ensure air quality does not deteriorate.

Full text:

See attached.

Object

Proposed Submission Core Strategy and Policies Development Plan Document Review

Representation ID: 22452

Received: 03/03/2015

Respondent: Mr Stanley Ager

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

It is unsound to allocate the entire Northern Fringe when its delivery may not be viable over the plan timescales. To lower this risk the CS should include a plan based on co-operating more closely with neighbouring LAs to deliver homes growth. The CS cannot guarantee delivery of the Country Park in a timely manner and so demonstrate it will not adversely affect the integrity of a European designated habitat. For soundness, policy CS10 and Infrastructure Table 8B need to be revised. Allocating the entire Northern Fringe for immediate development through multi-site starts is a high risk strategy that will result in severe traffic congestion for both North Ipswich and the town centre and will damage the future attractiveness and prosperity of town. With so few new jobs being created in the town centre, residents will have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements. In response to a planning application by Mersea Homes /CBRE Global Investors for the first phase of the Ipswich Garden Suburb, Suffolk County Council stated with regard to traffic '... the development has a severe impact on network performance and travel time.' IBC has been pinning their hopes on getting people out of their cars and onto public transport but with so few new jobs being created in the town centre, residents will mainly have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements and capacity such as a northern bypass or link road. New measures will also be required to ensure air quality does not deteriorate.

Full text:

See attached.

Object

Proposed Submission Core Strategy and Policies Development Plan Document Review

Representation ID: 22460

Received: 03/03/2015

Respondent: Mrs Julie Ager

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

It is unsound to allocate the entire Northern Fringe when its delivery may not be viable over the plan timescales. To lower this risk the CS should include a plan based on co-operating more closely with neighbouring LAs to deliver homes growth. The CS cannot guarantee delivery of the Country Park in a timely manner and so demonstrate it will not adversely affect the integrity of a European designated habitat. For soundness, policy CS10 and Infrastructure Table 8B need to be revised. Allocating the entire Northern Fringe for immediate development through multi-site starts is a high risk strategy that will result in severe traffic congestion for both North Ipswich and the town centre and will damage the future attractiveness and prosperity of town. With so few new jobs being created in the town centre, residents will have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements. In response to a planning application by Mersea Homes /CBRE Global Investors for the first phase of the Ipswich Garden Suburb, Suffolk County Council stated with regard to traffic '... the development has a severe impact on network performance and travel time.' IBC has been pinning their hopes on getting people out of their cars and onto public transport but with so few new jobs being created in the town centre, residents will mainly have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements and capacity such as a northern bypass or link road. New measures will also be required to ensure air quality does not deteriorate.

Full text:

See attached.

Object

Proposed Submission Core Strategy and Policies Development Plan Document Review

Representation ID: 22468

Received: 03/03/2015

Respondent: Mr & Mrs Eamonn McMurrough

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

It is unsound to allocate the entire Northern Fringe when its delivery may not be viable over the plan timescales. To lower this risk the CS should include a plan based on co-operating more closely with neighbouring LAs to deliver homes growth. The CS cannot guarantee delivery of the Country Park in a timely manner and so demonstrate it will not adversely affect the integrity of a European designated habitat. For soundness, policy CS10 and Infrastructure Table 8B need to be revised. Allocating the entire Northern Fringe for immediate development through multi-site starts is a high risk strategy that will result in severe traffic congestion for both North Ipswich and the town centre and will damage the future attractiveness and prosperity of town. With so few new jobs being created in the town centre, residents will have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements. In response to a planning application by Mersea Homes /CBRE Global Investors for the first phase of the Ipswich Garden Suburb, Suffolk County Council stated with regard to traffic '... the development has a severe impact on network performance and travel time.' IBC has been pinning their hopes on getting people out of their cars and onto public transport but with so few new jobs being created in the town centre, residents will mainly have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements and capacity such as a northern bypass or link road. New measures will also be required to ensure air quality does not deteriorate.

Full text:

See attached.

Object

Proposed Submission Core Strategy and Policies Development Plan Document Review

Representation ID: 22476

Received: 03/03/2015

Respondent: Mr & Mrs Eamonn McMurrough

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

It is unsound to allocate the entire Northern Fringe when its delivery may not be viable over the plan timescales. To lower this risk the CS should include a plan based on co-operating more closely with neighbouring LAs to deliver homes growth. The CS cannot guarantee delivery of the Country Park in a timely manner and so demonstrate it will not adversely affect the integrity of a European designated habitat. For soundness, policy CS10 and Infrastructure Table 8B need to be revised. Allocating the entire Northern Fringe for immediate development through multi-site starts is a high risk strategy that will result in severe traffic congestion for both North Ipswich and the town centre and will damage the future attractiveness and prosperity of town. With so few new jobs being created in the town centre, residents will have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements. In response to a planning application by Mersea Homes /CBRE Global Investors for the first phase of the Ipswich Garden Suburb, Suffolk County Council stated with regard to traffic '... the development has a severe impact on network performance and travel time.' IBC has been pinning their hopes on getting people out of their cars and onto public transport but with so few new jobs being created in the town centre, residents will mainly have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements and capacity such as a northern bypass or link road. New measures will also be required to ensure air quality does not deteriorate.

Full text:

See attached.

Object

Proposed Submission Core Strategy and Policies Development Plan Document Review

Representation ID: 22484

Received: 03/03/2015

Respondent: Mr Peter Green

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

It is unsound to allocate the entire Northern Fringe when its delivery may not be viable over the plan timescales. To lower this risk the CS should include a plan based on co-operating more closely with neighbouring LAs to deliver homes growth. The CS cannot guarantee delivery of the Country Park in a timely manner and so demonstrate it will not adversely affect the integrity of a European designated habitat. For soundness, policy CS10 and Infrastructure Table 8B need to be revised. Allocating the entire Northern Fringe for immediate development through multi-site starts is a high risk strategy that will result in severe traffic congestion for both North Ipswich and the town centre and will damage the future attractiveness and prosperity of town. With so few new jobs being created in the town centre, residents will have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements. In response to a planning application by Mersea Homes /CBRE Global Investors for the first phase of the Ipswich Garden Suburb, Suffolk County Council stated with regard to traffic '... the development has a severe impact on network performance and travel time.' IBC has been pinning their hopes on getting people out of their cars and onto public transport but with so few new jobs being created in the town centre, residents will mainly have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements and capacity such as a northern bypass or link road. New measures will also be required to ensure air quality does not deteriorate.

Full text:

See attached.

Object

Proposed Submission Core Strategy and Policies Development Plan Document Review

Representation ID: 22492

Received: 03/03/2015

Respondent: Mrs Jacqueline Green

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

It is unsound to allocate the entire Northern Fringe when its delivery may not be viable over the plan timescales. To lower this risk the CS should include a plan based on co-operating more closely with neighbouring LAs to deliver homes growth. The CS cannot guarantee delivery of the Country Park in a timely manner and so demonstrate it will not adversely affect the integrity of a European designated habitat. For soundness, policy CS10 and Infrastructure Table 8B need to be revised. Allocating the entire Northern Fringe for immediate development through multi-site starts is a high risk strategy that will result in severe traffic congestion for both North Ipswich and the town centre and will damage the future attractiveness and prosperity of town. With so few new jobs being created in the town centre, residents will have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements. In response to a planning application by Mersea Homes /CBRE Global Investors for the first phase of the Ipswich Garden Suburb, Suffolk County Council stated with regard to traffic '... the development has a severe impact on network performance and travel time.' IBC has been pinning their hopes on getting people out of their cars and onto public transport but with so few new jobs being created in the town centre, residents will mainly have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements and capacity such as a northern bypass or link road. New measures will also be required to ensure air quality does not deteriorate.

Full text:

See attached.

Object

Proposed Submission Core Strategy and Policies Development Plan Document Review

Representation ID: 22500

Received: 03/03/2015

Respondent: Mr S E Gaskin

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

It is unsound to allocate the entire Northern Fringe when its delivery may not be viable over the plan timescales. To lower this risk the CS should include a plan based on co-operating more closely with neighbouring LAs to deliver homes growth. The CS cannot guarantee delivery of the Country Park in a timely manner and so demonstrate it will not adversely affect the integrity of a European designated habitat. For soundness, policy CS10 and Infrastructure Table 8B need to be revised. Allocating the entire Northern Fringe for immediate development through multi-site starts is a high risk strategy that will result in severe traffic congestion for both North Ipswich and the town centre and will damage the future attractiveness and prosperity of town. With so few new jobs being created in the town centre, residents will have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements. In response to a planning application by Mersea Homes /CBRE Global Investors for the first phase of the Ipswich Garden Suburb, Suffolk County Council stated with regard to traffic '... the development has a severe impact on network performance and travel time.' IBC has been pinning their hopes on getting people out of their cars and onto public transport but with so few new jobs being created in the town centre, residents will mainly have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements and capacity such as a northern bypass or link road. New measures will also be required to ensure air quality does not deteriorate.

Full text:

See attached.

Object

Proposed Submission Core Strategy and Policies Development Plan Document Review

Representation ID: 22508

Received: 03/03/2015

Respondent: Mrs M E J Gaskin

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

It is unsound to allocate the entire Northern Fringe when its delivery may not be viable over the plan timescales. To lower this risk the CS should include a plan based on co-operating more closely with neighbouring LAs to deliver homes growth. The CS cannot guarantee delivery of the Country Park in a timely manner and so demonstrate it will not adversely affect the integrity of a European designated habitat. For soundness, policy CS10 and Infrastructure Table 8B need to be revised. Allocating the entire Northern Fringe for immediate development through multi-site starts is a high risk strategy that will result in severe traffic congestion for both North Ipswich and the town centre and will damage the future attractiveness and prosperity of town. With so few new jobs being created in the town centre, residents will have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements. In response to a planning application by Mersea Homes /CBRE Global Investors for the first phase of the Ipswich Garden Suburb, Suffolk County Council stated with regard to traffic '... the development has a severe impact on network performance and travel time.' IBC has been pinning their hopes on getting people out of their cars and onto public transport but with so few new jobs being created in the town centre, residents will mainly have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements and capacity such as a northern bypass or link road. New measures will also be required to ensure air quality does not deteriorate.

Full text:

See attached.

Object

Proposed Submission Core Strategy and Policies Development Plan Document Review

Representation ID: 22516

Received: 03/03/2015

Respondent: Mr Barry Laws

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

It is unsound to allocate the entire Northern Fringe when its delivery may not be viable over the plan timescales. To lower this risk the CS should include a plan based on co-operating more closely with neighbouring LAs to deliver homes growth. The CS cannot guarantee delivery of the Country Park in a timely manner and so demonstrate it will not adversely affect the integrity of a European designated habitat. For soundness, policy CS10 and Infrastructure Table 8B need to be revised. Allocating the entire Northern Fringe for immediate development through multi-site starts is a high risk strategy that will result in severe traffic congestion for both North Ipswich and the town centre and will damage the future attractiveness and prosperity of town. With so few new jobs being created in the town centre, residents will have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements. In response to a planning application by Mersea Homes /CBRE Global Investors for the first phase of the Ipswich Garden Suburb, Suffolk County Council stated with regard to traffic '... the development has a severe impact on network performance and travel time.' IBC has been pinning their hopes on getting people out of their cars and onto public transport but with so few new jobs being created in the town centre, residents will mainly have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements and capacity such as a northern bypass or link road. New measures will also be required to ensure air quality does not deteriorate.

Full text:

See attached.

Object

Proposed Submission Core Strategy and Policies Development Plan Document Review

Representation ID: 22524

Received: 03/03/2015

Respondent: Mrs Jane Laws

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

It is unsound to allocate the entire Northern Fringe when its delivery may not be viable over the plan timescales. To lower this risk the CS should include a plan based on co-operating more closely with neighbouring LAs to deliver homes growth. The CS cannot guarantee delivery of the Country Park in a timely manner and so demonstrate it will not adversely affect the integrity of a European designated habitat. For soundness, policy CS10 and Infrastructure Table 8B need to be revised. Allocating the entire Northern Fringe for immediate development through multi-site starts is a high risk strategy that will result in severe traffic congestion for both North Ipswich and the town centre and will damage the future attractiveness and prosperity of town. With so few new jobs being created in the town centre, residents will have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements. In response to a planning application by Mersea Homes /CBRE Global Investors for the first phase of the Ipswich Garden Suburb, Suffolk County Council stated with regard to traffic '... the development has a severe impact on network performance and travel time.' IBC has been pinning their hopes on getting people out of their cars and onto public transport but with so few new jobs being created in the town centre, residents will mainly have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements and capacity such as a northern bypass or link road. New measures will also be required to ensure air quality does not deteriorate.

Full text:

See attached.

Object

Proposed Submission Core Strategy and Policies Development Plan Document Review

Representation ID: 22532

Received: 03/03/2015

Respondent: Mr M J Jackson

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

It is unsound to allocate the entire Northern Fringe when its delivery may not be viable over the plan timescales. To lower this risk the CS should include a plan based on co-operating more closely with neighbouring LAs to deliver homes growth. The CS cannot guarantee delivery of the Country Park in a timely manner and so demonstrate it will not adversely affect the integrity of a European designated habitat. For soundness, policy CS10 and Infrastructure Table 8B need to be revised. Allocating the entire Northern Fringe for immediate development through multi-site starts is a high risk strategy that will result in severe traffic congestion for both North Ipswich and the town centre and will damage the future attractiveness and prosperity of town. With so few new jobs being created in the town centre, residents will have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements. In response to a planning application by Mersea Homes /CBRE Global Investors for the first phase of the Ipswich Garden Suburb, Suffolk County Council stated with regard to traffic '... the development has a severe impact on network performance and travel time.' IBC has been pinning their hopes on getting people out of their cars and onto public transport but with so few new jobs being created in the town centre, residents will mainly have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements and capacity such as a northern bypass or link road. New measures will also be required to ensure air quality does not deteriorate.

Full text:

See attached.

Object

Proposed Submission Core Strategy and Policies Development Plan Document Review

Representation ID: 22540

Received: 03/03/2015

Respondent: Mrs R A Jackson

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

It is unsound to allocate the entire Northern Fringe when its delivery may not be viable over the plan timescales. To lower this risk the CS should include a plan based on co-operating more closely with neighbouring LAs to deliver homes growth. The CS cannot guarantee delivery of the Country Park in a timely manner and so demonstrate it will not adversely affect the integrity of a European designated habitat. For soundness, policy CS10 and Infrastructure Table 8B need to be revised. Allocating the entire Northern Fringe for immediate development through multi-site starts is a high risk strategy that will result in severe traffic congestion for both North Ipswich and the town centre and will damage the future attractiveness and prosperity of town. With so few new jobs being created in the town centre, residents will have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements. In response to a planning application by Mersea Homes /CBRE Global Investors for the first phase of the Ipswich Garden Suburb, Suffolk County Council stated with regard to traffic '... the development has a severe impact on network performance and travel time.' IBC has been pinning their hopes on getting people out of their cars and onto public transport but with so few new jobs being created in the town centre, residents will mainly have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements and capacity such as a northern bypass or link road. New measures will also be required to ensure air quality does not deteriorate.

Full text:

See attached.

Object

Proposed Submission Core Strategy and Policies Development Plan Document Review

Representation ID: 22548

Received: 03/03/2015

Respondent: Mr & Mrs Robert and Gillian Ellis

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

It is unsound to allocate the entire Northern Fringe when its delivery may not be viable over the plan timescales. To lower this risk the CS should include a plan based on co-operating more closely with neighbouring LAs to deliver homes growth. The CS cannot guarantee delivery of the Country Park in a timely manner and so demonstrate it will not adversely affect the integrity of a European designated habitat. For soundness, policy CS10 and Infrastructure Table 8B need to be revised. Allocating the entire Northern Fringe for immediate development through multi-site starts is a high risk strategy that will result in severe traffic congestion for both North Ipswich and the town centre and will damage the future attractiveness and prosperity of town. With so few new jobs being created in the town centre, residents will have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements. In response to a planning application by Mersea Homes /CBRE Global Investors for the first phase of the Ipswich Garden Suburb, Suffolk County Council stated with regard to traffic '... the development has a severe impact on network performance and travel time.' IBC has been pinning their hopes on getting people out of their cars and onto public transport but with so few new jobs being created in the town centre, residents will mainly have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements and capacity such as a northern bypass or link road. New measures will also be required to ensure air quality does not deteriorate.

Full text:

See attached.

Object

Proposed Submission Core Strategy and Policies Development Plan Document Review

Representation ID: 22556

Received: 03/03/2015

Respondent: Mr Peter Edwards

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

It is unsound to allocate the entire Northern Fringe when its delivery may not be viable over the plan timescales. To lower this risk the CS should include a plan based on co-operating more closely with neighbouring LAs to deliver homes growth. The CS cannot guarantee delivery of the Country Park in a timely manner and so demonstrate it will not adversely affect the integrity of a European designated habitat. For soundness, policy CS10 and Infrastructure Table 8B need to be revised. Allocating the entire Northern Fringe for immediate development through multi-site starts is a high risk strategy that will result in severe traffic congestion for both North Ipswich and the town centre and will damage the future attractiveness and prosperity of town. With so few new jobs being created in the town centre, residents will have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements. In response to a planning application by Mersea Homes /CBRE Global Investors for the first phase of the Ipswich Garden Suburb, Suffolk County Council stated with regard to traffic '... the development has a severe impact on network performance and travel time.' IBC has been pinning their hopes on getting people out of their cars and onto public transport but with so few new jobs being created in the town centre, residents will mainly have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements and capacity such as a northern bypass or link road. New measures will also be required to ensure air quality does not deteriorate.

Full text:

See attached.

Object

Proposed Submission Core Strategy and Policies Development Plan Document Review

Representation ID: 22564

Received: 03/03/2015

Respondent: Mrs Emma Blaylock

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

It is unsound to allocate the entire Northern Fringe when its delivery may not be viable over the plan timescales. To lower this risk the CS should include a plan based on co-operating more closely with neighbouring LAs to deliver homes growth. The CS cannot guarantee delivery of the Country Park in a timely manner and so demonstrate it will not adversely affect the integrity of a European designated habitat. For soundness, policy CS10 and Infrastructure Table 8B need to be revised. Allocating the entire Northern Fringe for immediate development through multi-site starts is a high risk strategy that will result in severe traffic congestion for both North Ipswich and the town centre and will damage the future attractiveness and prosperity of town. With so few new jobs being created in the town centre, residents will have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements. In response to a planning application by Mersea Homes /CBRE Global Investors for the first phase of the Ipswich Garden Suburb, Suffolk County Council stated with regard to traffic '... the development has a severe impact on network performance and travel time.' IBC has been pinning their hopes on getting people out of their cars and onto public transport but with so few new jobs being created in the town centre, residents will mainly have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements and capacity such as a northern bypass or link road. New measures will also be required to ensure air quality does not deteriorate.

Full text:

See attached.

Object

Proposed Submission Core Strategy and Policies Development Plan Document Review

Representation ID: 22572

Received: 03/03/2015

Respondent: Mr Ricky Blaylock

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

It is unsound to allocate the entire Northern Fringe when its delivery may not be viable over the plan timescales. To lower this risk the CS should include a plan based on co-operating more closely with neighbouring LAs to deliver homes growth. The CS cannot guarantee delivery of the Country Park in a timely manner and so demonstrate it will not adversely affect the integrity of a European designated habitat. For soundness, policy CS10 and Infrastructure Table 8B need to be revised. Allocating the entire Northern Fringe for immediate development through multi-site starts is a high risk strategy that will result in severe traffic congestion for both North Ipswich and the town centre and will damage the future attractiveness and prosperity of town. With so few new jobs being created in the town centre, residents will have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements. In response to a planning application by Mersea Homes /CBRE Global Investors for the first phase of the Ipswich Garden Suburb, Suffolk County Council stated with regard to traffic '... the development has a severe impact on network performance and travel time.' IBC has been pinning their hopes on getting people out of their cars and onto public transport but with so few new jobs being created in the town centre, residents will mainly have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements and capacity such as a northern bypass or link road. New measures will also be required to ensure air quality does not deteriorate.

Full text:

See attached.

Object

Proposed Submission Core Strategy and Policies Development Plan Document Review

Representation ID: 22580

Received: 03/03/2015

Respondent: Mr B Murray

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

It is unsound to allocate the entire Northern Fringe when its delivery may not be viable over the plan timescales. To lower this risk the CS should include a plan based on co-operating more closely with neighbouring LAs to deliver homes growth. The CS cannot guarantee delivery of the Country Park in a timely manner and so demonstrate it will not adversely affect the integrity of a European designated habitat. For soundness, policy CS10 and Infrastructure Table 8B need to be revised. Allocating the entire Northern Fringe for immediate development through multi-site starts is a high risk strategy that will result in severe traffic congestion for both North Ipswich and the town centre and will damage the future attractiveness and prosperity of town. With so few new jobs being created in the town centre, residents will have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements. In response to a planning application by Mersea Homes /CBRE Global Investors for the first phase of the Ipswich Garden Suburb, Suffolk County Council stated with regard to traffic '... the development has a severe impact on network performance and travel time.' IBC has been pinning their hopes on getting people out of their cars and onto public transport but with so few new jobs being created in the town centre, residents will mainly have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements and capacity such as a northern bypass or link road. New measures will also be required to ensure air quality does not deteriorate.

Full text:

See attached.

Object

Proposed Submission Core Strategy and Policies Development Plan Document Review

Representation ID: 22588

Received: 03/03/2015

Respondent: Mrs Mandy Green

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

It is unsound to allocate the entire Northern Fringe when its delivery may not be viable over the plan timescales. To lower this risk the CS should include a plan based on co-operating more closely with neighbouring LAs to deliver homes growth. The CS cannot guarantee delivery of the Country Park in a timely manner and so demonstrate it will not adversely affect the integrity of a European designated habitat. For soundness, policy CS10 and Infrastructure Table 8B need to be revised. Allocating the entire Northern Fringe for immediate development through multi-site starts is a high risk strategy that will result in severe traffic congestion for both North Ipswich and the town centre and will damage the future attractiveness and prosperity of town. With so few new jobs being created in the town centre, residents will have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements. In response to a planning application by Mersea Homes /CBRE Global Investors for the first phase of the Ipswich Garden Suburb, Suffolk County Council stated with regard to traffic '... the development has a severe impact on network performance and travel time.' IBC has been pinning their hopes on getting people out of their cars and onto public transport but with so few new jobs being created in the town centre, residents will mainly have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements and capacity such as a northern bypass or link road. New measures will also be required to ensure air quality does not deteriorate.

Full text:

See attached.

Object

Proposed Submission Core Strategy and Policies Development Plan Document Review

Representation ID: 22596

Received: 03/03/2015

Respondent: Mr Terence Marsh

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

It is unsound to allocate the entire Northern Fringe when its delivery may not be viable over the plan timescales. To lower this risk the CS should include a plan based on co-operating more closely with neighbouring LAs to deliver homes growth. The CS cannot guarantee delivery of the Country Park in a timely manner and so demonstrate it will not adversely affect the integrity of a European designated habitat. For soundness, policy CS10 and Infrastructure Table 8B need to be revised. Allocating the entire Northern Fringe for immediate development through multi-site starts is a high risk strategy that will result in severe traffic congestion for both North Ipswich and the town centre and will damage the future attractiveness and prosperity of town. With so few new jobs being created in the town centre, residents will have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements. In response to a planning application by Mersea Homes /CBRE Global Investors for the first phase of the Ipswich Garden Suburb, Suffolk County Council stated with regard to traffic '... the development has a severe impact on network performance and travel time.' IBC has been pinning their hopes on getting people out of their cars and onto public transport but with so few new jobs being created in the town centre, residents will mainly have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements and capacity such as a northern bypass or link road. New measures will also be required to ensure air quality does not deteriorate.

Full text:

See attached.

Object

Proposed Submission Core Strategy and Policies Development Plan Document Review

Representation ID: 22604

Received: 03/03/2015

Respondent: Mrs Jacqueline Marsh

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

It is unsound to allocate the entire Northern Fringe when its delivery may not be viable over the plan timescales. To lower this risk the CS should include a plan based on co-operating more closely with neighbouring LAs to deliver homes growth. The CS cannot guarantee delivery of the Country Park in a timely manner and so demonstrate it will not adversely affect the integrity of a European designated habitat. For soundness, policy CS10 and Infrastructure Table 8B need to be revised. Allocating the entire Northern Fringe for immediate development through multi-site starts is a high risk strategy that will result in severe traffic congestion for both North Ipswich and the town centre and will damage the future attractiveness and prosperity of town. With so few new jobs being created in the town centre, residents will have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements. In response to a planning application by Mersea Homes /CBRE Global Investors for the first phase of the Ipswich Garden Suburb, Suffolk County Council stated with regard to traffic '... the development has a severe impact on network performance and travel time.' IBC has been pinning their hopes on getting people out of their cars and onto public transport but with so few new jobs being created in the town centre, residents will mainly have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements and capacity such as a northern bypass or link road. New measures will also be required to ensure air quality does not deteriorate.

Full text:

See attached.

Object

Proposed Submission Core Strategy and Policies Development Plan Document Review

Representation ID: 22612

Received: 03/03/2015

Respondent: Mr R Paul

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

It is unsound to allocate the entire Northern Fringe when its delivery may not be viable over the plan timescales. To lower this risk the CS should include a plan based on co-operating more closely with neighbouring LAs to deliver homes growth. The CS cannot guarantee delivery of the Country Park in a timely manner and so demonstrate it will not adversely affect the integrity of a European designated habitat. For soundness, policy CS10 and Infrastructure Table 8B need to be revised. Allocating the entire Northern Fringe for immediate development through multi-site starts is a high risk strategy that will result in severe traffic congestion for both North Ipswich and the town centre and will damage the future attractiveness and prosperity of town. With so few new jobs being created in the town centre, residents will have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements. In response to a planning application by Mersea Homes /CBRE Global Investors for the first phase of the Ipswich Garden Suburb, Suffolk County Council stated with regard to traffic '... the development has a severe impact on network performance and travel time.' IBC has been pinning their hopes on getting people out of their cars and onto public transport but with so few new jobs being created in the town centre, residents will mainly have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements and capacity such as a northern bypass or link road. New measures will also be required to ensure air quality does not deteriorate.

Full text:

See attached.

Object

Proposed Submission Core Strategy and Policies Development Plan Document Review

Representation ID: 22620

Received: 03/03/2015

Respondent: Mrs Paul

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

It is unsound to allocate the entire Northern Fringe when its delivery may not be viable over the plan timescales. To lower this risk the CS should include a plan based on co-operating more closely with neighbouring LAs to deliver homes growth. The CS cannot guarantee delivery of the Country Park in a timely manner and so demonstrate it will not adversely affect the integrity of a European designated habitat. For soundness, policy CS10 and Infrastructure Table 8B need to be revised. Allocating the entire Northern Fringe for immediate development through multi-site starts is a high risk strategy that will result in severe traffic congestion for both North Ipswich and the town centre and will damage the future attractiveness and prosperity of town. With so few new jobs being created in the town centre, residents will have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements. In response to a planning application by Mersea Homes /CBRE Global Investors for the first phase of the Ipswich Garden Suburb, Suffolk County Council stated with regard to traffic '... the development has a severe impact on network performance and travel time.' IBC has been pinning their hopes on getting people out of their cars and onto public transport but with so few new jobs being created in the town centre, residents will mainly have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements and capacity such as a northern bypass or link road. New measures will also be required to ensure air quality does not deteriorate.

Full text:

See attached.

Object

Proposed Submission Core Strategy and Policies Development Plan Document Review

Representation ID: 22628

Received: 03/03/2015

Respondent: Mrs Sue Humphrys

Legally compliant? Not specified

Sound? No

Duty to co-operate? No

Representation Summary:

It's unsound to allocate the entire Northern Fringe when its delivery may not be viable over plan timescales. How will infrastructure be provided? The CS should be based on co-operating more closely with neighbouring LAs to deliver homes growth. The CS cannot guarantee delivery of the Country Park in a timely manner and so demonstrate it will not harm a European designated habitat. Allowing multi-site starts will result in severe congestion and damage the attractiveness and prosperity of Ipswich. With few new jobs being created in the town centre, residents will have to commute by car to jobs growth sites.

Full text:

See attached.

Object

Proposed Submission Core Strategy and Policies Development Plan Document Review

Representation ID: 22636

Received: 03/03/2015

Respondent: Mr Bryn Humphrys

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

It's unsound to allocate the entire Northern Fringe when its delivery may not be viable over plan timescales. How will infrastructure be provided? The CS should be based on co-operating more closely with neighbouring LAs to deliver homes growth. The CS cannot guarantee delivery of the Country Park in a timely manner and so demonstrate it will not harm a European designated habitat. Allowing multi-site starts will result in severe congestion and damage the attractiveness and prosperity of Ipswich. With few new jobs being created in the town centre, residents will have to commute by car to jobs growth sites.

Full text:

See attached.

Object

Proposed Submission Core Strategy and Policies Development Plan Document Review

Representation ID: 22644

Received: 03/03/2015

Respondent: Mrs Lynne Morley

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

It is unsound to allocate the entire Northern Fringe when its delivery may not be viable over the plan timescales. To lower this risk the CS should include a plan based on co-operating more closely with neighbouring LAs to deliver homes growth. The CS cannot guarantee delivery of the Country Park in a timely manner and so demonstrate it will not adversely affect the integrity of a European designated habitat. For soundness, policy CS10 and Infrastructure Table 8B need to be revised. Allocating the entire Northern Fringe for immediate development through multi-site starts is a high risk strategy that will result in severe traffic congestion for both North Ipswich and the town centre and will damage the future attractiveness and prosperity of town. With so few new jobs being created in the town centre, residents will have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements. In response to a planning application by Mersea Homes /CBRE Global Investors for the first phase of the Ipswich Garden Suburb, Suffolk County Council stated with regard to traffic '... the development has a severe impact on network performance and travel time.' IBC has been pinning their hopes on getting people out of their cars and onto public transport but with so few new jobs being created in the town centre, residents will mainly have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements and capacity such as a northern bypass or link road. New measures will also be required to ensure air quality does not deteriorate.

Full text:

See attached.

Object

Proposed Submission Core Strategy and Policies Development Plan Document Review

Representation ID: 22652

Received: 03/03/2015

Respondent: Mr Neil Morley

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

It is unsound to allocate the entire Northern Fringe when its delivery may not be viable over the plan timescales. To lower this risk the CS should include a plan based on co-operating more closely with neighbouring LAs to deliver homes growth. The CS cannot guarantee delivery of the Country Park in a timely manner and so demonstrate it will not adversely affect the integrity of a European designated habitat. For soundness, policy CS10 and Infrastructure Table 8B need to be revised. Allocating the entire Northern Fringe for immediate development through multi-site starts is a high risk strategy that will result in severe traffic congestion for both North Ipswich and the town centre and will damage the future attractiveness and prosperity of town. With so few new jobs being created in the town centre, residents will have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements. In response to a planning application by Mersea Homes /CBRE Global Investors for the first phase of the Ipswich Garden Suburb, Suffolk County Council stated with regard to traffic '... the development has a severe impact on network performance and travel time.' IBC has been pinning their hopes on getting people out of their cars and onto public transport but with so few new jobs being created in the town centre, residents will mainly have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements and capacity such as a northern bypass or link road. New measures will also be required to ensure air quality does not deteriorate.

Full text:

See attached.

Object

Proposed Submission Core Strategy and Policies Development Plan Document Review

Representation ID: 22660

Received: 03/03/2015

Respondent: Mr Harry Downes

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

It is unsound to allocate the entire Northern Fringe when its delivery may not be viable over the plan timescales. To lower this risk the CS should include a plan based on co-operating more closely with neighbouring LAs to deliver homes growth. The CS cannot guarantee delivery of the Country Park in a timely manner and so demonstrate it will not adversely affect the integrity of a European designated habitat. For soundness, policy CS10 and Infrastructure Table 8B need to be revised. Allocating the entire Northern Fringe for immediate development through multi-site starts is a high risk strategy that will result in severe traffic congestion for both North Ipswich and the town centre and will damage the future attractiveness and prosperity of town. With so few new jobs being created in the town centre, residents will have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements. In response to a planning application by Mersea Homes /CBRE Global Investors for the first phase of the Ipswich Garden Suburb, Suffolk County Council stated with regard to traffic '... the development has a severe impact on network performance and travel time.' IBC has been pinning their hopes on getting people out of their cars and onto public transport but with so few new jobs being created in the town centre, residents will mainly have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements and capacity such as a northern bypass or link road. New measures will also be required to ensure air quality does not deteriorate.

Full text:

See attached.

Object

Proposed Submission Core Strategy and Policies Development Plan Document Review

Representation ID: 22668

Received: 03/03/2015

Respondent: Mrs Margaret Downes

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

It is unsound to allocate the entire Northern Fringe when its delivery may not be viable over the plan timescales. To lower this risk the CS should include a plan based on co-operating more closely with neighbouring LAs to deliver homes growth. The CS cannot guarantee delivery of the Country Park in a timely manner and so demonstrate it will not adversely affect the integrity of a European designated habitat. For soundness, policy CS10 and Infrastructure Table 8B need to be revised. Allocating the entire Northern Fringe for immediate development through multi-site starts is a high risk strategy that will result in severe traffic congestion for both North Ipswich and the town centre and will damage the future attractiveness and prosperity of town. With so few new jobs being created in the town centre, residents will have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements. In response to a planning application by Mersea Homes /CBRE Global Investors for the first phase of the Ipswich Garden Suburb, Suffolk County Council stated with regard to traffic '... the development has a severe impact on network performance and travel time.' IBC has been pinning their hopes on getting people out of their cars and onto public transport but with so few new jobs being created in the town centre, residents will mainly have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements and capacity such as a northern bypass or link road. New measures will also be required to ensure air quality does not deteriorate.

Full text:

See attached.

Object

Proposed Submission Core Strategy and Policies Development Plan Document Review

Representation ID: 22676

Received: 03/03/2015

Respondent: Mr R M Alexander

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

It is unsound to allocate the entire Northern Fringe when its delivery may not be viable over the plan timescales. To lower this risk the CS should include a plan based on co-operating more closely with neighbouring LAs to deliver homes growth. The CS cannot guarantee delivery of the Country Park in a timely manner and so demonstrate it will not adversely affect the integrity of a European designated habitat. For soundness, policy CS10 and Infrastructure Table 8B need to be revised. Allocating the entire Northern Fringe for immediate development through multi-site starts is a high risk strategy that will result in severe traffic congestion for both North Ipswich and the town centre and will damage the future attractiveness and prosperity of town. With so few new jobs being created in the town centre, residents will have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements. In response to a planning application by Mersea Homes /CBRE Global Investors for the first phase of the Ipswich Garden Suburb, Suffolk County Council stated with regard to traffic '... the development has a severe impact on network performance and travel time.' IBC has been pinning their hopes on getting people out of their cars and onto public transport but with so few new jobs being created in the town centre, residents will mainly have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements and capacity such as a northern bypass or link road. New measures will also be required to ensure air quality does not deteriorate.

Full text:

See attached.