Ipswich Borough Council Local Plan Core Strategy and Policies Development Plan Document Review - Final Draft
Search representations
Results for Northern Fringe Protection Group search
New searchObject
Ipswich Borough Council Local Plan Core Strategy and Policies Development Plan Document Review - Final Draft
Chapter 6 - Vision and Objectives
Representation ID: 26493
Received: 02/03/2020
Respondent: Northern Fringe Protection Group
Legally compliant? Not specified
Sound? No
Duty to co-operate? Not specified
Objective 6:
1. Junctions/ link roads at/near capacity, not addressed. No evidence growth is sound.
2. Severe capacity issues in 2026 but no infrastructure projects in Infrastructure Tables. Especially town centre, Ipswich Garden Suburb and A1214.
3.Modelling fails to identify when junctions will reach capacity.
4. Failing to Improve Access in breach of CS5. Modal Shift assumptions too high, uncompliant with CS20.
5. CCC assumes 10% modal shift by 2050. No evidence 15% modal shift deliverable by 2026? CCC assumption should be used.
6. Existing walking/ cycling infrastructure substandard, won't enable delivery of modal shift. Need new cycling indicator.
Not specified
Object
Ipswich Borough Council Local Plan Core Strategy and Policies Development Plan Document Review - Final Draft
Policy CS5 Improving Accessibility
Representation ID: 26494
Received: 02/03/2020
Respondent: Northern Fringe Protection Group
Legally compliant? Not specified
Sound? No
Duty to co-operate? Not specified
IBC is failing to Improve Access in breach of CS5. More needs to be done otherwise Modal Switch assumptions too high and unsound. CS is not justified with respect to Improving Access and Transport. concerned that our comments on CS5 and CS20 in relation to the transport modelling and modal shift (and associated air quality issues) have not been adequately considered. disappointing that the Transport Mitigation Strategy and other relevant modal shift documents have not been included in the Evidence Base. new infrastructure required is substantially underestimated as is the difficulty in achieving the unprecedented levels of modal shift necessary.
Not specified
Object
Ipswich Borough Council Local Plan Core Strategy and Policies Development Plan Document Review - Final Draft
Policy CS20 Key Transport Proposals
Representation ID: 26495
Received: 02/03/2020
Respondent: Northern Fringe Protection Group
Legally compliant? Not specified
Sound? No
Duty to co-operate? Not specified
IBC is failing to Improve Access in breach of CS20. More needs to be done otherwise Modal Switch assumptions too high and unsound. CS is not justified with respect to Improving Access and Transport. Concerned our comments on CS20 in relation to the transport modelling and modal shift haven't been adequately considered. Transport Mitigation Strategy and other relevant modal shift documents not included in Evidence Base. New infrastructure required is substantially underestimated as is the difficulty in achieving the unprecedented levels of modal shift necessary. See detailed comments on Transport Modelling and Mitigation Strategy (pages 26 - 32). Amend 8.241.
Amend paragraph 8.241 to "Air Quality Management Areas are designated in areas where poor air quality will have an effect on people’s health”.
Object
Ipswich Borough Council Local Plan Core Strategy and Policies Development Plan Document Review - Final Draft
Chapter 6 - Vision and Objectives
Representation ID: 26496
Received: 02/03/2020
Respondent: Northern Fringe Protection Group
Legally compliant? Not specified
Sound? No
Duty to co-operate? Not specified
Objective 6 (continued)
7. No funding allocated in IBC’s financial plan to encourage modal shift.
8. Doesn't include proportionate evidence. New Evidence database incomplete as excludes Transport documents, especially modal shift related and S106 schedules for approved IGS developments which haven't been made publicly available.
9. Concerned that road bridges (and country park) may not be delivered in time (February 2022) to receive £9.8m HIF. If so, then CS is unsound unless alternative funding available.
10. Not positively prepared as fails to fully assess transport infrastructure requirements, especially in relation to timing of delivery (including sewage).
Not specified
Object
Ipswich Borough Council Local Plan Core Strategy and Policies Development Plan Document Review - Final Draft
Chapter 6 - Vision and Objectives
Representation ID: 26497
Received: 02/03/2020
Respondent: Northern Fringe Protection Group
Legally compliant? Not specified
Sound? No
Duty to co-operate? Not specified
Objective 5:
- Inconsistent with national policy, fails to comply with legal limits. Must be requirement.
- Strengthen commitment to Improve Air Quality, no real improvement over past decade.
- No funding in financial plan for improving air quality.
- No AQA. Must be completed urgently. Include assessments for early years of developments, construction traffic, rail/sea and different levels of modal shift rather than unsubstantiated levels assumed.
- Pointless undertaking an AQA in 2036, banned non-electric vehicles. Early years worst. Suggest earlier assessment.
- Ambiguity over 2004 emission levels cited.
- Object to removal of 'improve Air Quality' objective/ indicator.
Undertake an air quality assessment earlier in the plan period and not 2036. Reinstate 'Number of recorded air quality exceedances' as indicator.
Object
Ipswich Borough Council Local Plan Core Strategy and Policies Development Plan Document Review - Final Draft
Chapter 6 - Vision and Objectives
Representation ID: 26498
Received: 02/03/2020
Respondent: Northern Fringe Protection Group
Legally compliant? Not specified
Sound? No
Duty to co-operate? Not specified
Objectives 4 and 9; At the Executive meeting 9th July 2019 Ipswich Borough Council Declared a Climate Emergency. The CS needs to be updated to incorporate this to be sound.
The Climate Emergency needs to be incorporated into the CS to the sound.
Object
Ipswich Borough Council Local Plan Core Strategy and Policies Development Plan Document Review - Final Draft
Policy DM13 Built Heritage and Conservation
Representation ID: 26499
Received: 02/03/2020
Respondent: Northern Fringe Protection Group
Legally compliant? Not specified
Sound? No
Duty to co-operate? Not specified
We strongly object to the re-designation of the Ipswich “green rim” to “green trails”. This is in breach of DM13 and unsound.
Not specified
Object
Ipswich Borough Council Local Plan Core Strategy and Policies Development Plan Document Review - Final Draft
Policy DM4 Development and Flood Risk
Representation ID: 26500
Received: 02/03/2020
Respondent: Northern Fringe Protection Group
Legally compliant? Not specified
Sound? No
Duty to co-operate? Not specified
The current situation regarding flood risk assessment within the CS is ambiguous and somewhat confused. This needs to be clarified and made clearer so that any required actions can be properly identified and included in the CS for it to be sound and understood by residents.(see image of better map to illustrate.)
Not specified
Object
Ipswich Borough Council Local Plan Core Strategy and Policies Development Plan Document Review - Final Draft
Chapter 10 - Implementation
Representation ID: 26506
Received: 02/03/2020
Respondent: Northern Fringe Protection Group
Legally compliant? Not specified
Sound? No
Duty to co-operate? Not specified
No firm proposals for new sewage infrastructure required for the IGS and the wider Ipswich area, which need to be consulted upon and included in the Infrastructure Tables. The 13 transport projects need to be included in the Infrastructure Tables. If any of projects aren't delivered by the required dates (which need to be identified) then the traffic modelling will be flawed as traffic flows will not have been properly assessed and the CS unsound. Evidence needed showing funding is in place for these schemes compatible with required delivery dates. Bramford Road/ Sproughton Road link road must be included.
Include firm proposals for new sewage infrastructure in tables. Include 13 transport projects and dates for completion to deliver transport mitigation programme. Include Bramford Road/ Sproughton Road link Road (IP029).
Object
Ipswich Borough Council Local Plan Core Strategy and Policies Development Plan Document Review - Final Draft
Chapter 6 - Vision and Objectives
Representation ID: 26507
Received: 02/03/2020
Respondent: Northern Fringe Protection Group
Legally compliant? Not specified
Sound? No
Duty to co-operate? Not specified
Specific Objectives are required to ensure delivery of key aspects of the CS such as improving transport infrastructure, improving air quality, delivering modal shift and improving accessibility are required. These need to be monitored and reported on to ensure the CS is effective. The Vision needs to include an improvement in air quality levels and compliance with legally binding
targets. Climate emergency also needs to be included.
Specific Objectives are required to ensure delivery of key aspects of the CS such as improving transport infrastructure, improving air quality, delivering modal shift and improving accessibility. Include air quality improvement and climate emergency within vision.