ipswich.gov.uk

CS10: Ipswich Garden Suburb

Showing comments and forms 1021 to 1050 of 1091

Object

Proposed Submission Core Strategy and Policies Development Plan Document Review

Representation ID: 23593

Received: 25/02/2015

Respondent: Mrs Bridget Bullock

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

The CS cannot guarantee delivery of the Country Park in a timely manner and so demonstrate it will not harm the integrity of a European designated habitat. CS10 and table 8B need to be revised.

Full text:

See attached.

Object

Proposed Submission Core Strategy and Policies Development Plan Document Review

Representation ID: 23599

Received: 25/02/2015

Respondent: Mr Richard Partridge

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

It is unsound to allocate the entire Northern Fringe when its delivery may not be viable over the plan timescales. To lower this risk the CS should include a plan based on co-operating more closely with neighbouring LAs to deliver homes growth. The CS cannot guarantee delivery of the Country Park in a timely manner and so demonstrate it will not adversely affect the integrity of a European designated habitat. For soundness, policy CS10 and Infrastructure Table 8B need to be revised. Allocating the entire Northern Fringe for immediate development through multi-site starts is a high risk strategy that will result in severe traffic congestion for both North Ipswich and the town centre and will damage the future attractiveness and prosperity of town. With so few new jobs being created in the town centre, residents will have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements. In response to a planning application by Mersea Homes /CBRE Global Investors for the first phase of the Ipswich Garden Suburb, Suffolk County Council stated with regard to traffic '... the development has a severe impact on network performance and travel time.' IBC has been pinning their hopes on getting people out of their cars and onto public transport but with so few new jobs being created in the town centre, residents will mainly have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements and capacity such as a northern bypass or link road. New measures will also be required to ensure air quality does not deteriorate.

Full text:

See attached.

Object

Proposed Submission Core Strategy and Policies Development Plan Document Review

Representation ID: 23612

Received: 25/02/2015

Respondent: Mr N Tappin

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

It is unsound to allocate the entire Northern Fringe when its delivery may not be viable over the plan timescales. To lower this risk the CS should include a plan based on co-operating more closely with neighbouring LAs to deliver homes growth. The CS cannot guarantee delivery of the Country Park in a timely manner and so demonstrate it will not adversely affect the integrity of a European designated habitat. For soundness, policy CS10 and Infrastructure Table 8B need to be revised. Allocating the entire Northern Fringe for immediate development through multi-site starts is a high risk strategy that will result in severe traffic congestion for both North Ipswich and the town centre and will damage the future attractiveness and prosperity of town. With so few new jobs being created in the town centre, residents will have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements. In response to a planning application by Mersea Homes /CBRE Global Investors for the first phase of the Ipswich Garden Suburb, Suffolk County Council stated with regard to traffic '... the development has a severe impact on network performance and travel time.' IBC has been pinning their hopes on getting people out of their cars and onto public transport but with so few new jobs being created in the town centre, residents will mainly have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements and capacity such as a northern bypass or link road. New measures will also be required to ensure air quality does not deteriorate.

Full text:

See attached.

Object

Proposed Submission Core Strategy and Policies Development Plan Document Review

Representation ID: 23625

Received: 25/02/2015

Respondent: Mr Ian Ling

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

It is unsound to allocate the entire Northern Fringe when its delivery may not be viable over the plan timescales. To lower this risk the CS should include a plan based on co-operating more closely with neighbouring LAs to deliver homes growth. The CS cannot guarantee delivery of the Country Park in a timely manner and so demonstrate it will not adversely affect the integrity of a European designated habitat. For soundness, policy CS10 and Infrastructure Table 8B need to be revised. Allocating the entire Northern Fringe for immediate development through multi-site starts is a high risk strategy that will result in severe traffic congestion for both North Ipswich and the town centre and will damage the future attractiveness and prosperity of town. With so few new jobs being created in the town centre, residents will have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements. In response to a planning application by Mersea Homes /CBRE Global Investors for the first phase of the Ipswich Garden Suburb, Suffolk County Council stated with regard to traffic '... the development has a severe impact on network performance and travel time.' IBC has been pinning their hopes on getting people out of their cars and onto public transport but with so few new jobs being created in the town centre, residents will mainly have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements and capacity such as a northern bypass or link road. New measures will also be required to ensure air quality does not deteriorate.

Full text:

See attached.

Object

Proposed Submission Core Strategy and Policies Development Plan Document Review

Representation ID: 23632

Received: 25/02/2015

Respondent: Mr Ian Ling

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

The CS cannot guarantee delivery of the Country Park in a timely manner and so demonstrate it will not harm the integrity of a European designated habitat. CS10 and table 8B need to be revised.

Full text:

See attached.

Object

Proposed Submission Core Strategy and Policies Development Plan Document Review

Representation ID: 23638

Received: 25/02/2015

Respondent: Mrs Jane Ling

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

It is unsound to allocate the entire Northern Fringe when its delivery may not be viable over the plan timescales. To lower this risk the CS should include a plan based on co-operating more closely with neighbouring LAs to deliver homes growth. The CS cannot guarantee delivery of the Country Park in a timely manner and so demonstrate it will not adversely affect the integrity of a European designated habitat. For soundness, policy CS10 and Infrastructure Table 8B need to be revised. Allocating the entire Northern Fringe for immediate development through multi-site starts is a high risk strategy that will result in severe traffic congestion for both North Ipswich and the town centre and will damage the future attractiveness and prosperity of town. With so few new jobs being created in the town centre, residents will have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements. In response to a planning application by Mersea Homes /CBRE Global Investors for the first phase of the Ipswich Garden Suburb, Suffolk County Council stated with regard to traffic '... the development has a severe impact on network performance and travel time.' IBC has been pinning their hopes on getting people out of their cars and onto public transport but with so few new jobs being created in the town centre, residents will mainly have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements and capacity such as a northern bypass or link road. New measures will also be required to ensure air quality does not deteriorate.

Full text:

See attached.

Object

Proposed Submission Core Strategy and Policies Development Plan Document Review

Representation ID: 23645

Received: 25/02/2015

Respondent: Mrs Jane Ling

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

The CS cannot guarantee delivery of the Country Park in a timely manner and so demonstrate it will not harm the integrity of a European designated habitat. CS10 and table 8B need to be revised.

Full text:

See attached.

Object

Proposed Submission Core Strategy and Policies Development Plan Document Review

Representation ID: 23651

Received: 25/02/2015

Respondent: Mr Keith Williams

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

It is unsound to allocate the entire Northern Fringe when its delivery may not be viable over the plan timescales. To lower this risk the CS should include a plan based on co-operating more closely with neighbouring LAs to deliver homes growth. The CS cannot guarantee delivery of the Country Park in a timely manner and so demonstrate it will not adversely affect the integrity of a European designated habitat. For soundness, policy CS10 and Infrastructure Table 8B need to be revised. Allocating the entire Northern Fringe for immediate development through multi-site starts is a high risk strategy that will result in severe traffic congestion for both North Ipswich and the town centre and will damage the future attractiveness and prosperity of town. With so few new jobs being created in the town centre, residents will have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements. In response to a planning application by Mersea Homes /CBRE Global Investors for the first phase of the Ipswich Garden Suburb, Suffolk County Council stated with regard to traffic '... the development has a severe impact on network performance and travel time.' IBC has been pinning their hopes on getting people out of their cars and onto public transport but with so few new jobs being created in the town centre, residents will mainly have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements and capacity such as a northern bypass or link road. New measures will also be required to ensure air quality does not deteriorate.

Full text:

See attached.

Object

Proposed Submission Core Strategy and Policies Development Plan Document Review

Representation ID: 23658

Received: 25/02/2015

Respondent: Mr Keith Williams

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

The CS cannot guarantee delivery of the Country Park in a timely manner and so demonstrate it will not harm the integrity of a European designated habitat. CS10 and table 8B need to be revised.

Full text:

See attached.

Object

Proposed Submission Core Strategy and Policies Development Plan Document Review

Representation ID: 23664

Received: 25/02/2015

Respondent: Mrs Laura Stafford

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

It is unsound to allocate the entire Northern Fringe when its delivery may not be viable over the plan timescales. To lower this risk the CS should include a plan based on co-operating more closely with neighbouring LAs to deliver homes growth. The CS cannot guarantee delivery of the Country Park in a timely manner and so demonstrate it will not adversely affect the integrity of a European designated habitat. For soundness, policy CS10 and Infrastructure Table 8B need to be revised. Allocating the entire Northern Fringe for immediate development through multi-site starts is a high risk strategy that will result in severe traffic congestion for both North Ipswich and the town centre and will damage the future attractiveness and prosperity of town. With so few new jobs being created in the town centre, residents will have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements. In response to a planning application by Mersea Homes /CBRE Global Investors for the first phase of the Ipswich Garden Suburb, Suffolk County Council stated with regard to traffic '... the development has a severe impact on network performance and travel time.' IBC has been pinning their hopes on getting people out of their cars and onto public transport but with so few new jobs being created in the town centre, residents will mainly have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements and capacity such as a northern bypass or link road. New measures will also be required to ensure air quality does not deteriorate.

Full text:

See attached.

Object

Proposed Submission Core Strategy and Policies Development Plan Document Review

Representation ID: 23671

Received: 25/02/2015

Respondent: Mrs Laura Stafford

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

The CS cannot guarantee delivery of the Country Park in a timely manner and so demonstrate it will not harm the integrity of a European designated habitat. CS10 and table 8B need to be revised.

Full text:

See attached.

Object

Proposed Submission Core Strategy and Policies Development Plan Document Review

Representation ID: 23677

Received: 25/02/2015

Respondent: Miss Sheila Hancock

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

It is unsound to allocate the entire Northern Fringe when its delivery may not be viable over the plan timescales. To lower this risk the CS should include a plan based on co-operating more closely with neighbouring LAs to deliver homes growth. The CS cannot guarantee delivery of the Country Park in a timely manner and so demonstrate it will not adversely affect the integrity of a European designated habitat. For soundness, policy CS10 and Infrastructure Table 8B need to be revised. Allocating the entire Northern Fringe for immediate development through multi-site starts is a high risk strategy that will result in severe traffic congestion for both North Ipswich and the town centre and will damage the future attractiveness and prosperity of town. With so few new jobs being created in the town centre, residents will have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements. In response to a planning application by Mersea Homes /CBRE Global Investors for the first phase of the Ipswich Garden Suburb, Suffolk County Council stated with regard to traffic '... the development has a severe impact on network performance and travel time.' IBC has been pinning their hopes on getting people out of their cars and onto public transport but with so few new jobs being created in the town centre, residents will mainly have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements and capacity such as a northern bypass or link road. New measures will also be required to ensure air quality does not deteriorate.

Full text:

See attached.

Object

Proposed Submission Core Strategy and Policies Development Plan Document Review

Representation ID: 23690

Received: 25/02/2015

Respondent: Mr John Alcock

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

It is unsound to allocate the entire Northern Fringe when its delivery may not be viable over the plan timescales. To lower this risk the CS should include a plan based on co-operating more closely with neighbouring LAs to deliver homes growth. The CS cannot guarantee delivery of the Country Park in a timely manner and so demonstrate it will not adversely affect the integrity of a European designated habitat. For soundness, policy CS10 and Infrastructure Table 8B need to be revised. Allocating the entire Northern Fringe for immediate development through multi-site starts is a high risk strategy that will result in severe traffic congestion for both North Ipswich and the town centre and will damage the future attractiveness and prosperity of town. With so few new jobs being created in the town centre, residents will have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements. In response to a planning application by Mersea Homes /CBRE Global Investors for the first phase of the Ipswich Garden Suburb, Suffolk County Council stated with regard to traffic '... the development has a severe impact on network performance and travel time.' IBC has been pinning their hopes on getting people out of their cars and onto public transport but with so few new jobs being created in the town centre, residents will mainly have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements and capacity such as a northern bypass or link road. New measures will also be required to ensure air quality does not deteriorate.

Full text:

See attached.

Object

Proposed Submission Core Strategy and Policies Development Plan Document Review

Representation ID: 23697

Received: 25/02/2015

Respondent: Mr John Alcock

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

The CS cannot guarantee delivery of the Country Park in a timely manner and so demonstrate it will not harm the integrity of a European designated habitat. CS10 and table 8B need to be revised.

Full text:

See attached.

Object

Proposed Submission Core Strategy and Policies Development Plan Document Review

Representation ID: 23703

Received: 25/02/2015

Respondent: Mrs Sheila Alcock

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

It is unsound to allocate the entire Northern Fringe when its delivery may not be viable over the plan timescales. To lower this risk the CS should include a plan based on co-operating more closely with neighbouring LAs to deliver homes growth. The CS cannot guarantee delivery of the Country Park in a timely manner and so demonstrate it will not adversely affect the integrity of a European designated habitat. For soundness, policy CS10 and Infrastructure Table 8B need to be revised. Allocating the entire Northern Fringe for immediate development through multi-site starts is a high risk strategy that will result in severe traffic congestion for both North Ipswich and the town centre and will damage the future attractiveness and prosperity of town. With so few new jobs being created in the town centre, residents will have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements. In response to a planning application by Mersea Homes /CBRE Global Investors for the first phase of the Ipswich Garden Suburb, Suffolk County Council stated with regard to traffic '... the development has a severe impact on network performance and travel time.' IBC has been pinning their hopes on getting people out of their cars and onto public transport but with so few new jobs being created in the town centre, residents will mainly have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements and capacity such as a northern bypass or link road. New measures will also be required to ensure air quality does not deteriorate.

Full text:

See attached.

Object

Proposed Submission Core Strategy and Policies Development Plan Document Review

Representation ID: 23710

Received: 25/02/2015

Respondent: Mrs Sheila Alcock

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

The CS cannot guarantee delivery of the Country Park in a timely manner and so demonstrate it will not harm the integrity of a European designated habitat. CS10 and table 8B need to be revised.

Full text:

See attached.

Object

Proposed Submission Core Strategy and Policies Development Plan Document Review

Representation ID: 23716

Received: 25/02/2015

Respondent: Mr B Hemming

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

It is unsound to allocate the entire Northern Fringe when its delivery may not be viable over the plan timescales. To lower this risk the CS should include a plan based on co-operating more closely with neighbouring LAs to deliver homes growth. The CS cannot guarantee delivery of the Country Park in a timely manner and so demonstrate it will not adversely affect the integrity of a European designated habitat. For soundness, policy CS10 and Infrastructure Table 8B need to be revised. Allocating the entire Northern Fringe for immediate development through multi-site starts is a high risk strategy that will result in severe traffic congestion for both North Ipswich and the town centre and will damage the future attractiveness and prosperity of town. With so few new jobs being created in the town centre, residents will have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements. In response to a planning application by Mersea Homes /CBRE Global Investors for the first phase of the Ipswich Garden Suburb, Suffolk County Council stated with regard to traffic '... the development has a severe impact on network performance and travel time.' IBC has been pinning their hopes on getting people out of their cars and onto public transport but with so few new jobs being created in the town centre, residents will mainly have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements and capacity such as a northern bypass or link road. New measures will also be required to ensure air quality does not deteriorate.

Full text:

See attached.

Object

Proposed Submission Core Strategy and Policies Development Plan Document Review

Representation ID: 23730

Received: 25/02/2015

Respondent: Mrs Sandra Moore

Legally compliant? Not specified

Sound? No

Duty to co-operate? No

Representation Summary:

It's unsound to allocate the entire Northern Fringe when its delivery may not be viable over plan timescales. How will infrastructure be provided? The CS should be based on co-operating more closely with neighbouring LAs to deliver homes growth. The CS cannot guarantee delivery of the Country Park in a timely manner and so demonstrate it will not harm a European designated habitat. Allowing multi-site starts will result in severe congestion and damage the attractiveness and prosperity of Ipswich. With few new jobs being created in the town centre, residents will have to commute by car to jobs growth sites.

Full text:

See attached.

Object

Proposed Submission Core Strategy and Policies Development Plan Document Review

Representation ID: 23742

Received: 25/02/2015

Respondent: Mr R English

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

It is unsound to allocate the entire Northern Fringe when its delivery may not be viable over the plan timescales. To lower this risk the CS should include a plan based on co-operating more closely with neighbouring LAs to deliver homes growth. The CS cannot guarantee delivery of the Country Park in a timely manner and so demonstrate it will not adversely affect the integrity of a European designated habitat. For soundness, policy CS10 and Infrastructure Table 8B need to be revised. Allocating the entire Northern Fringe for immediate development through multi-site starts is a high risk strategy that will result in severe traffic congestion for both North Ipswich and the town centre and will damage the future attractiveness and prosperity of town. With so few new jobs being created in the town centre, residents will have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements. In response to a planning application by Mersea Homes /CBRE Global Investors for the first phase of the Ipswich Garden Suburb, Suffolk County Council stated with regard to traffic '... the development has a severe impact on network performance and travel time.' IBC has been pinning their hopes on getting people out of their cars and onto public transport but with so few new jobs being created in the town centre, residents will mainly have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements and capacity such as a northern bypass or link road. New measures will also be required to ensure air quality does not deteriorate.

Full text:

See attached.

Object

Proposed Submission Core Strategy and Policies Development Plan Document Review

Representation ID: 23755

Received: 25/02/2015

Respondent: Mrs Maureen Morris

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

It's unsound to allocate the entire Northern Fringe when its delivery may not be viable over the plan timescales. The CS should be based on co-operating more closely with neighbouring LAs to deliver homes growth. The CS cannot guarantee delivery of the Country Park in a timely manner and so demonstrate it will not harm the integrity of a European designated habitat. Allowing multi-site starts will result in severe congestion and damage the future attractiveness and prosperity of Ipswich. With few new jobs being created in the town centre, residents will have to commute by car to jobs growth sites.

Full text:

See attached.

Object

Proposed Submission Core Strategy and Policies Development Plan Document Review

Representation ID: 23762

Received: 25/02/2015

Respondent: Mrs Maureen Morris

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

The CS cannot guarantee delivery of the Country Park in a timely manner and so demonstrate it will not harm the integrity of a European designated habitat. CS10 and table 8B need to be revised.

Full text:

See attached.

Object

Proposed Submission Core Strategy and Policies Development Plan Document Review

Representation ID: 23768

Received: 25/02/2015

Respondent: Mr Mark Fozzard

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

It is unsound to allocate the entire Northern Fringe when its delivery may not be viable over the plan timescales. To lower this risk the CS should include a plan based on co-operating more closely with neighbouring LAs to deliver homes growth. The CS cannot guarantee delivery of the Country Park in a timely manner and so demonstrate it will not adversely affect the integrity of a European designated habitat. For soundness, policy CS10 and Infrastructure Table 8B need to be revised. Allocating the entire Northern Fringe for immediate development through multi-site starts is a high risk strategy that will result in severe traffic congestion for both North Ipswich and the town centre and will damage the future attractiveness and prosperity of town. With so few new jobs being created in the town centre, residents will have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements. In response to a planning application by Mersea Homes /CBRE Global Investors for the first phase of the Ipswich Garden Suburb, Suffolk County Council stated with regard to traffic '... the development has a severe impact on network performance and travel time.' IBC has been pinning their hopes on getting people out of their cars and onto public transport but with so few new jobs being created in the town centre, residents will mainly have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements and capacity such as a northern bypass or link road. New measures will also be required to ensure air quality does not deteriorate.

Full text:

See attached.

Object

Proposed Submission Core Strategy and Policies Development Plan Document Review

Representation ID: 23775

Received: 25/02/2015

Respondent: Mr Mark Fozzard

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

The CS cannot guarantee delivery of the Country Park in a timely manner and so demonstrate it will not harm the integrity of a European designated habitat. CS10 and table 8B need to be revised.

Full text:

See attached.

Object

Proposed Submission Core Strategy and Policies Development Plan Document Review

Representation ID: 23794

Received: 25/02/2015

Respondent: Mr Gareth Ward

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

It is unsound to allocate the entire Northern Fringe when its delivery may not be viable over the plan timescales. To lower this risk the CS should include a plan based on co-operating more closely with neighbouring LAs to deliver homes growth. Allocating the entire Northern Fringe for immediate development through multi-site starts is a high risk strategy that will result in severe traffic congestion for both North Ipswich and the town centre and will damage the future attractiveness and prosperity of town. With so few new jobs being created in the town centre, residents will have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements. In response to a planning application by Mersea Homes /CBRE Global Investors for the first phase of the Ipswich Garden Suburb, Suffolk County Council stated with regard to traffic '... the development has a severe impact on network performance and travel time.' IBC has been pinning their hopes on getting people out of their cars and onto public transport but with so few new jobs being created in the town centre, residents will mainly have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements and capacity such as a northern bypass or link road. New measures will also be required to ensure air quality does not deteriorate.

Full text:

See attached.

Object

Proposed Submission Core Strategy and Policies Development Plan Document Review

Representation ID: 23807

Received: 25/02/2015

Respondent: Mrs Michelle Ward

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

It is unsound to allocate the entire Northern Fringe when its delivery may not be viable over the plan timescales. To lower this risk the CS should include a plan based on co-operating more closely with neighbouring LAs to deliver homes growth. The CS cannot guarantee delivery of the Country Park in a timely manner and so demonstrate it will not adversely affect the integrity of a European designated habitat. For soundness, policy CS10 and Infrastructure Table 8B need to be revised. Allocating the entire Northern Fringe for immediate development through multi-site starts is a high risk strategy that will result in severe traffic congestion for both North Ipswich and the town centre and will damage the future attractiveness and prosperity of town. With so few new jobs being created in the town centre, residents will have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements. In response to a planning application by Mersea Homes /CBRE Global Investors for the first phase of the Ipswich Garden Suburb, Suffolk County Council stated with regard to traffic '... the development has a severe impact on network performance and travel time.' IBC has been pinning their hopes on getting people out of their cars and onto public transport but with so few new jobs being created in the town centre, residents will mainly have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements and capacity such as a northern bypass or link road. New measures will also be required to ensure air quality does not deteriorate.

Full text:

See attached.

Object

Proposed Submission Core Strategy and Policies Development Plan Document Review

Representation ID: 23820

Received: 25/02/2015

Respondent: Mr K Bannister

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

It is unsound to allocate the entire Northern Fringe when its delivery may not be viable over the plan timescales. To lower this risk the CS should include a plan based on co-operating more closely with neighbouring LAs to deliver homes growth. The CS cannot guarantee delivery of the Country Park in a timely manner and so demonstrate it will not adversely affect the integrity of a European designated habitat. For soundness, policy CS10 and Infrastructure Table 8B need to be revised. Allocating the entire Northern Fringe for immediate development through multi-site starts is a high risk strategy that will result in severe traffic congestion for both North Ipswich and the town centre and will damage the future attractiveness and prosperity of town. With so few new jobs being created in the town centre, residents will have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements. In response to a planning application by Mersea Homes /CBRE Global Investors for the first phase of the Ipswich Garden Suburb, Suffolk County Council stated with regard to traffic '... the development has a severe impact on network performance and travel time.' IBC has been pinning their hopes on getting people out of their cars and onto public transport but with so few new jobs being created in the town centre, residents will mainly have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements and capacity such as a northern bypass or link road. New measures will also be required to ensure air quality does not deteriorate.

Full text:

See attached.

Object

Proposed Submission Core Strategy and Policies Development Plan Document Review

Representation ID: 23821

Received: 25/02/2015

Respondent: Mr K Bannister

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

It's unsound to allocate the entire Northern Fringe when its delivery may not be viable over the plan timescales. The CS should be based on co-operating more closely with neighbouring LAs to deliver homes growth.
It is unsound to allocate the entire Northern Fringe when its delivery may not be viable over the plan timescales. To lower this risk the CS should include a plan based on co-operating more closely with neighbouring LAs to deliver homes growth. The CS cannot guarantee delivery of the Country Park in a timely manner and so demonstrate it will not adversely affect the integrity of a European designated habitat. For soundness, policy CS10 and Infrastructure Table 8B need to be revised. Allocating the entire Northern Fringe for immediate development through multi-site starts is a high risk strategy that will result in severe traffic congestion for both North Ipswich and the town centre and will damage the future attractiveness and prosperity of town. With so few new jobs being created in the town centre, residents will have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements. In response to a planning application by Mersea Homes /CBRE Global Investors for the first phase of the Ipswich Garden Suburb, Suffolk County Council stated with regard to traffic '... the development has a severe impact on network performance and travel time.' IBC has been pinning their hopes on getting people out of their cars and onto public transport but with so few new jobs being created in the town centre, resident will mainly have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements and capacity such as a northern bypass or link road. New measures will also be required to ensure air quality does not deteriorate.

Full text:

See attached.

Object

Proposed Submission Core Strategy and Policies Development Plan Document Review

Representation ID: 23827

Received: 25/02/2015

Respondent: Mr K Bannister

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

The CS cannot guarantee delivery of the Country Park in a timely manner and so demonstrate it will not harm the integrity of a European designated habitat. CS10 and table 8B need to be revised.

Full text:

See attached.

Object

Proposed Submission Core Strategy and Policies Development Plan Document Review

Representation ID: 23833

Received: 25/02/2015

Respondent: Mrs S Lydford

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

It is unsound to allocate the entire Northern Fringe when its delivery may not be viable over the plan timescales. To lower this risk the CS should include a plan based on co-operating more closely with neighbouring LAs to deliver homes growth. The CS cannot guarantee delivery of the Country Park in a timely manner and so demonstrate it will not adversely affect the integrity of a European designated habitat. For soundness, policy CS10 and Infrastructure Table 8B need to be revised. Allocating the entire Northern Fringe for immediate development through multi-site starts is a high risk strategy that will result in severe traffic congestion for both North Ipswich and the town centre and will damage the future attractiveness and prosperity of town. With so few new jobs being created in the town centre, residents will have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements. In response to a planning application by Mersea Homes /CBRE Global Investors for the first phase of the Ipswich Garden Suburb, Suffolk County Council stated with regard to traffic '... the development has a severe impact on network performance and travel time.' IBC has been pinning their hopes on getting people out of their cars and onto public transport but with so few new jobs being created in the town centre, residents will mainly have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements and capacity such as a northern bypass or link road. New measures will also be required to ensure air quality does not deteriorate.

Full text:

See attached.

Object

Proposed Submission Core Strategy and Policies Development Plan Document Review

Representation ID: 23840

Received: 25/02/2015

Respondent: Mrs S Lydford

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

The CS cannot guarantee delivery of the Country Park in a timely manner and so demonstrate it will not harm the integrity of a European designated habitat. CS10 and table 8B need to be revised.

Full text:

See attached.