CS10: Ipswich Garden Suburb
Object
Proposed Submission Core Strategy and Policies Development Plan Document Review
Representation ID: 23326
Received: 25/02/2015
Respondent: Ms Elspeth MacFadyen
Legally compliant? Not specified
Sound? No
Duty to co-operate? Not specified
It is unsound to allocate the entire Northern Fringe when its delivery may not be viable over the plan timescales. To lower this risk the CS should include a plan based on co-operating more closely with neighbouring LAs to deliver homes growth. The CS cannot guarantee delivery of the Country Park in a timely manner and so demonstrate it will not adversely affect the integrity of a European designated habitat. For soundness, policy CS10 and Infrastructure Table 8B need to be revised. Allocating the entire Northern Fringe for immediate development through multi-site starts is a high risk strategy that will result in severe traffic congestion for both North Ipswich and the town centre and will damage the future attractiveness and prosperity of town. With so few new jobs being created in the town centre, residents will have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements. In response to a planning application by Mersea Homes /CBRE Global Investors for the first phase of the Ipswich Garden Suburb, Suffolk County Council stated with regard to traffic '... the development has a severe impact on network performance and travel time.' IBC has been pinning their hopes on getting people out of their cars and onto public transport but with so few new jobs being created in the town centre, residents will mainly have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements and capacity such as a northern bypass or link road. New measures will also be required to ensure air quality does not deteriorate.
See attached.
Object
Proposed Submission Core Strategy and Policies Development Plan Document Review
Representation ID: 23339
Received: 25/02/2015
Respondent: Mr Tom Cheen
Legally compliant? Not specified
Sound? No
Duty to co-operate? Not specified
It is unsound to allocate the entire Northern Fringe when its delivery may not be viable over the plan timescales. To lower this risk the CS should include a plan based on co-operating more closely with neighbouring LAs to deliver homes growth. The CS cannot guarantee delivery of the Country Park in a timely manner and so demonstrate it will not adversely affect the integrity of a European designated habitat. For soundness, policy CS10 and Infrastructure Table 8B need to be revised. Allocating the entire Northern Fringe for immediate development through multi-site starts is a high risk strategy that will result in severe traffic congestion for both North Ipswich and the town centre and will damage the future attractiveness and prosperity of town. With so few new jobs being created in the town centre, residents will have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements. In response to a planning application by Mersea Homes /CBRE Global Investors for the first phase of the Ipswich Garden Suburb, Suffolk County Council stated with regard to traffic '... the development has a severe impact on network performance and travel time.' IBC has been pinning their hopes on getting people out of their cars and onto public transport but with so few new jobs being created in the town centre, residents will mainly have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements and capacity such as a northern bypass or link road. New measures will also be required to ensure air quality does not deteriorate.
See attached.
Object
Proposed Submission Core Strategy and Policies Development Plan Document Review
Representation ID: 23352
Received: 25/02/2015
Respondent: Miss Sarah Jennings
Legally compliant? Not specified
Sound? No
Duty to co-operate? Not specified
It is unsound to allocate the entire Northern Fringe when its delivery may not be viable over the plan timescales. To lower this risk the CS should include a plan based on co-operating more closely with neighbouring LAs to deliver homes growth. The CS cannot guarantee delivery of the Country Park in a timely manner and so demonstrate it will not adversely affect the integrity of a European designated habitat. For soundness, policy CS10 and Infrastructure Table 8B need to be revised. Allocating the entire Northern Fringe for immediate development through multi-site starts is a high risk strategy that will result in severe traffic congestion for both North Ipswich and the town centre and will damage the future attractiveness and prosperity of town. With so few new jobs being created in the town centre, residents will have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements. In response to a planning application by Mersea Homes /CBRE Global Investors for the first phase of the Ipswich Garden Suburb, Suffolk County Council stated with regard to traffic '... the development has a severe impact on network performance and travel time.' IBC has been pinning their hopes on getting people out of their cars and onto public transport but with so few new jobs being created in the town centre, residents will mainly have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements and capacity such as a northern bypass or link road. New measures will also be required to ensure air quality does not deteriorate.
See attached.
Object
Proposed Submission Core Strategy and Policies Development Plan Document Review
Representation ID: 23365
Received: 25/02/2015
Respondent: Mr Brian Morris
Legally compliant? Not specified
Sound? No
Duty to co-operate? Not specified
It is unsound to allocate the entire Northern Fringe when its delivery may not be viable over the plan timescales. To lower this risk the CS should include a plan based on co-operating more closely with neighbouring LAs to deliver homes growth. The CS cannot guarantee delivery of the Country Park in a timely manner and so demonstrate it will not adversely affect the integrity of a European designated habitat. For soundness, policy CS10 and Infrastructure Table 8B need to be revised. Allocating the entire Northern Fringe for immediate development through multi-site starts is a high risk strategy that will result in severe traffic congestion for both North Ipswich and the town centre and will damage the future attractiveness and prosperity of town. With so few new jobs being created in the town centre, residents will have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements. In response to a planning application by Mersea Homes /CBRE Global Investors for the first phase of the Ipswich Garden Suburb, Suffolk County Council stated with regard to traffic '... the development has a severe impact on network performance and travel time.' IBC has been pinning their hopes on getting people out of their cars and onto public transport but with so few new jobs being created in the town centre, residents will mainly have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements and capacity such as a northern bypass or link road. New measures will also be required to ensure air quality does not deteriorate.
See attached.
Object
Proposed Submission Core Strategy and Policies Development Plan Document Review
Representation ID: 23366
Received: 25/02/2015
Respondent: Mr Brian Morris
Legally compliant? Not specified
Sound? No
Duty to co-operate? Not specified
It's unsound to allocate the entire Northern Fringe when its delivery may not be viable over the plan timescales. The CS should be based on co-operating more closely with neighbouring LAs to deliver homes growth.
It is unsound to allocate the entire Northern Fringe when its delivery may not be viable over the plan timescales. To lower this risk the CS should include a plan based on co-operating more closely with neighbouring LAs to deliver homes growth. The CS cannot guarantee delivery of the Country Park in a timely manner and so demonstrate it will not adversely affect the integrity of a European designated habitat. For soundness, policy CS10 and Infrastructure Table 8B need to be revised. Allocating the entire Northern Fringe for immediate development through multi-site starts is a high risk strategy that will result in severe traffic congestion for both North Ipswich and the town centre and will damage the future attractiveness and prosperity of town. With so few new jobs being created in the town centre, residents will have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements. In response to a planning application by Mersea Homes /CBRE Global Investors for the first phase of the Ipswich Garden Suburb, Suffolk County Council stated with regard to traffic '... the development has a severe impact on network performance and travel time.' IBC has been pinning their hopes on getting people out of their cars and onto public transport but with so few new jobs being created in the town centre, resident will mainly have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements and capacity such as a northern bypass or link road. New measures will also be required to ensure air quality does not deteriorate.
See attached.
Object
Proposed Submission Core Strategy and Policies Development Plan Document Review
Representation ID: 23372
Received: 25/02/2015
Respondent: Mr Brian Morris
Legally compliant? Not specified
Sound? No
Duty to co-operate? Not specified
The CS cannot guarantee delivery of the Country Park in a timely manner and so demonstrate it will not harm the integrity of a European designated habitat. CS10 and table 8B need to be revised.
See attached.
Object
Proposed Submission Core Strategy and Policies Development Plan Document Review
Representation ID: 23378
Received: 25/02/2015
Respondent: Mr Roger Holt
Legally compliant? Not specified
Sound? No
Duty to co-operate? Not specified
It is unsound to allocate the entire Northern Fringe when its delivery may not be viable over the plan timescales. To lower this risk the CS should include a plan based on co-operating more closely with neighbouring LAs to deliver homes growth. The CS cannot guarantee delivery of the Country Park in a timely manner and so demonstrate it will not adversely affect the integrity of a European designated habitat. For soundness, policy CS10 and Infrastructure Table 8B need to be revised. Allocating the entire Northern Fringe for immediate development through multi-site starts is a high risk strategy that will result in severe traffic congestion for both North Ipswich and the town centre and will damage the future attractiveness and prosperity of town. With so few new jobs being created in the town centre, residents will have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements. In response to a planning application by Mersea Homes /CBRE Global Investors for the first phase of the Ipswich Garden Suburb, Suffolk County Council stated with regard to traffic '... the development has a severe impact on network performance and travel time.' IBC has been pinning their hopes on getting people out of their cars and onto public transport but with so few new jobs being created in the town centre, residents will mainly have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements and capacity such as a northern bypass or link road. New measures will also be required to ensure air quality does not deteriorate.
See attached.
Object
Proposed Submission Core Strategy and Policies Development Plan Document Review
Representation ID: 23391
Received: 25/02/2015
Respondent: Mrs Gillian Holt
Legally compliant? Not specified
Sound? No
Duty to co-operate? Not specified
It is unsound to allocate the entire Northern Fringe when its delivery may not be viable over the plan timescales. To lower this risk the CS should include a plan based on co-operating more closely with neighbouring LAs to deliver homes growth. The CS cannot guarantee delivery of the Country Park in a timely manner and so demonstrate it will not adversely affect the integrity of a European designated habitat. For soundness, policy CS10 and Infrastructure Table 8B need to be revised. Allocating the entire Northern Fringe for immediate development through multi-site starts is a high risk strategy that will result in severe traffic congestion for both North Ipswich and the town centre and will damage the future attractiveness and prosperity of town. With so few new jobs being created in the town centre, residents will have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements. In response to a planning application by Mersea Homes /CBRE Global Investors for the first phase of the Ipswich Garden Suburb, Suffolk County Council stated with regard to traffic '... the development has a severe impact on network performance and travel time.' IBC has been pinning their hopes on getting people out of their cars and onto public transport but with so few new jobs being created in the town centre, residents will mainly have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements and capacity such as a northern bypass or link road. New measures will also be required to ensure air quality does not deteriorate.
See attached.
Object
Proposed Submission Core Strategy and Policies Development Plan Document Review
Representation ID: 23404
Received: 25/02/2015
Respondent: Mr Colin Bennett
Legally compliant? Not specified
Sound? No
Duty to co-operate? Not specified
It is unsound to allocate the entire Northern Fringe when its delivery may not be viable over the plan timescales. To lower this risk the CS should include a plan based on co-operating more closely with neighbouring LAs to deliver homes growth. The CS cannot guarantee delivery of the Country Park in a timely manner and so demonstrate it will not adversely affect the integrity of a European designated habitat. For soundness, policy CS10 and Infrastructure Table 8B need to be revised. Allocating the entire Northern Fringe for immediate development through multi-site starts is a high risk strategy that will result in severe traffic congestion for both North Ipswich and the town centre and will damage the future attractiveness and prosperity of town. With so few new jobs being created in the town centre, residents will have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements. In response to a planning application by Mersea Homes /CBRE Global Investors for the first phase of the Ipswich Garden Suburb, Suffolk County Council stated with regard to traffic '... the development has a severe impact on network performance and travel time.' IBC has been pinning their hopes on getting people out of their cars and onto public transport but with so few new jobs being created in the town centre, residents will mainly have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements and capacity such as a northern bypass or link road. New measures will also be required to ensure air quality does not deteriorate.
See attached.
Object
Proposed Submission Core Strategy and Policies Development Plan Document Review
Representation ID: 23411
Received: 25/02/2015
Respondent: Mr Colin Bennett
Legally compliant? Not specified
Sound? No
Duty to co-operate? Not specified
The CS cannot guarantee delivery of the Country Park in a timely manner and so demonstrate it will not harm the integrity of a European designated habitat. CS10 and table 8B need to be revised.
See attached.
Object
Proposed Submission Core Strategy and Policies Development Plan Document Review
Representation ID: 23418
Received: 25/02/2015
Respondent: Miss Chelsea Bennett
Legally compliant? Not specified
Sound? No
Duty to co-operate? Not specified
It is unsound to allocate the entire Northern Fringe when its delivery may not be viable over the plan timescales. To lower this risk the CS should include a plan based on co-operating more closely with neighbouring LAs to deliver homes growth. The CS cannot guarantee delivery of the Country Park in a timely manner and so demonstrate it will not adversely affect the integrity of a European designated habitat. For soundness, policy CS10 and Infrastructure Table 8B need to be revised. Allocating the entire Northern Fringe for immediate development through multi-site starts is a high risk strategy that will result in severe traffic congestion for both North Ipswich and the town centre and will damage the future attractiveness and prosperity of town. With so few new jobs being created in the town centre, residents will have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements. In response to a planning application by Mersea Homes /CBRE Global Investors for the first phase of the Ipswich Garden Suburb, Suffolk County Council stated with regard to traffic '... the development has a severe impact on network performance and travel time.' IBC has been pinning their hopes on getting people out of their cars and onto public transport but with so few new jobs being created in the town centre, residents will mainly have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements and capacity such as a northern bypass or link road. New measures will also be required to ensure air quality does not deteriorate.
See attached.
Object
Proposed Submission Core Strategy and Policies Development Plan Document Review
Representation ID: 23430
Received: 25/02/2015
Respondent: Mrs J Cole-Jones
Legally compliant? Not specified
Sound? No
Duty to co-operate? Not specified
It is unsound to allocate the entire Northern Fringe when its delivery may not be viable over the plan timescales. To lower this risk the CS should include a plan based on co-operating more closely with neighbouring LAs to deliver homes growth. The CS cannot guarantee delivery of the Country Park in a timely manner and so demonstrate it will not adversely affect the integrity of a European designated habitat. For soundness, policy CS10 and Infrastructure Table 8B need to be revised. Allocating the entire Northern Fringe for immediate development through multi-site starts is a high risk strategy that will result in severe traffic congestion for both North Ipswich and the town centre and will damage the future attractiveness and prosperity of town. With so few new jobs being created in the town centre, residents will have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements. In response to a planning application by Mersea Homes /CBRE Global Investors for the first phase of the Ipswich Garden Suburb, Suffolk County Council stated with regard to traffic '... the development has a severe impact on network performance and travel time.' IBC has been pinning their hopes on getting people out of their cars and onto public transport but with so few new jobs being created in the town centre, residents will mainly have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements and capacity such as a northern bypass or link road. New measures will also be required to ensure air quality does not deteriorate.
See attached.
Object
Proposed Submission Core Strategy and Policies Development Plan Document Review
Representation ID: 23437
Received: 25/02/2015
Respondent: Mrs J Cole-Jones
Legally compliant? Not specified
Sound? No
Duty to co-operate? Not specified
The CS cannot guarantee delivery of the Country Park in a timely manner and so demonstrate it will not harm the integrity of a European designated habitat. CS10 and table 8B need to be revised.
See attached.
Object
Proposed Submission Core Strategy and Policies Development Plan Document Review
Representation ID: 23443
Received: 25/02/2015
Respondent: Mr & Mrs T B Strutt
Legally compliant? Not specified
Sound? No
Duty to co-operate? Not specified
It is unsound to allocate the entire Northern Fringe when its delivery may not be viable over the plan timescales. To lower this risk the CS should include a plan based on co-operating more closely with neighbouring LAs to deliver homes growth. The CS cannot guarantee delivery of the Country Park in a timely manner and so demonstrate it will not adversely affect the integrity of a European designated habitat. For soundness, policy CS10 and Infrastructure Table 8B need to be revised. Allocating the entire Northern Fringe for immediate development through multi-site starts is a high risk strategy that will result in severe traffic congestion for both North Ipswich and the town centre and will damage the future attractiveness and prosperity of town. With so few new jobs being created in the town centre, residents will have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements. In response to a planning application by Mersea Homes /CBRE Global Investors for the first phase of the Ipswich Garden Suburb, Suffolk County Council stated with regard to traffic '... the development has a severe impact on network performance and travel time.' IBC has been pinning their hopes on getting people out of their cars and onto public transport but with so few new jobs being created in the town centre, residents will mainly have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements and capacity such as a northern bypass or link road. New measures will also be required to ensure air quality does not deteriorate.
See attached.
Object
Proposed Submission Core Strategy and Policies Development Plan Document Review
Representation ID: 23456
Received: 25/02/2015
Respondent: Mr & Mrs T B Strutt
Legally compliant? Not specified
Sound? No
Duty to co-operate? Not specified
It is unsound to allocate the entire Northern Fringe when its delivery may not be viable over the plan timescales. To lower this risk the CS should include a plan based on co-operating more closely with neighbouring LAs to deliver homes growth. The CS cannot guarantee delivery of the Country Park in a timely manner and so demonstrate it will not adversely affect the integrity of a European designated habitat. For soundness, policy CS10 and Infrastructure Table 8B need to be revised. Allocating the entire Northern Fringe for immediate development through multi-site starts is a high risk strategy that will result in severe traffic congestion for both North Ipswich and the town centre and will damage the future attractiveness and prosperity of town. With so few new jobs being created in the town centre, residents will have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements. In response to a planning application by Mersea Homes /CBRE Global Investors for the first phase of the Ipswich Garden Suburb, Suffolk County Council stated with regard to traffic '... the development has a severe impact on network performance and travel time.' IBC has been pinning their hopes on getting people out of their cars and onto public transport but with so few new jobs being created in the town centre, residents will mainly have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements and capacity such as a northern bypass or link road. New measures will also be required to ensure air quality does not deteriorate.
See attached.
Object
Proposed Submission Core Strategy and Policies Development Plan Document Review
Representation ID: 23469
Received: 25/02/2015
Respondent: Mr Barry Tooke
Legally compliant? Not specified
Sound? No
Duty to co-operate? Not specified
It is unsound to allocate the entire Northern Fringe when its delivery may not be viable over the plan timescales. To lower this risk the CS should include a plan based on co-operating more closely with neighbouring LAs to deliver homes growth. The CS cannot guarantee delivery of the Country Park in a timely manner and so demonstrate it will not adversely affect the integrity of a European designated habitat. For soundness, policy CS10 and Infrastructure Table 8B need to be revised. Allocating the entire Northern Fringe for immediate development through multi-site starts is a high risk strategy that will result in severe traffic congestion for both North Ipswich and the town centre and will damage the future attractiveness and prosperity of town. With so few new jobs being created in the town centre, residents will have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements. In response to a planning application by Mersea Homes /CBRE Global Investors for the first phase of the Ipswich Garden Suburb, Suffolk County Council stated with regard to traffic '... the development has a severe impact on network performance and travel time.' IBC has been pinning their hopes on getting people out of their cars and onto public transport but with so few new jobs being created in the town centre, residents will mainly have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements and capacity such as a northern bypass or link road. New measures will also be required to ensure air quality does not deteriorate.
See attached.
Object
Proposed Submission Core Strategy and Policies Development Plan Document Review
Representation ID: 23482
Received: 25/02/2015
Respondent: Mrs Lesley Tooke
Legally compliant? Not specified
Sound? No
Duty to co-operate? Not specified
It is unsound to allocate the entire Northern Fringe when its delivery may not be viable over the plan timescales. To lower this risk the CS should include a plan based on co-operating more closely with neighbouring LAs to deliver homes growth. The CS cannot guarantee delivery of the Country Park in a timely manner and so demonstrate it will not adversely affect the integrity of a European designated habitat. For soundness, policy CS10 and Infrastructure Table 8B need to be revised. Allocating the entire Northern Fringe for immediate development through multi-site starts is a high risk strategy that will result in severe traffic congestion for both North Ipswich and the town centre and will damage the future attractiveness and prosperity of town. With so few new jobs being created in the town centre, residents will have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements. In response to a planning application by Mersea Homes /CBRE Global Investors for the first phase of the Ipswich Garden Suburb, Suffolk County Council stated with regard to traffic '... the development has a severe impact on network performance and travel time.' IBC has been pinning their hopes on getting people out of their cars and onto public transport but with so few new jobs being created in the town centre, residents will mainly have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements and capacity such as a northern bypass or link road. New measures will also be required to ensure air quality does not deteriorate.
See attached.
Object
Proposed Submission Core Strategy and Policies Development Plan Document Review
Representation ID: 23495
Received: 25/02/2015
Respondent: Mr Derek Ford
Legally compliant? Not specified
Sound? No
Duty to co-operate? Not specified
It is unsound to allocate the entire Northern Fringe when its delivery may not be viable over the plan timescales. To lower this risk the CS should include a plan based on co-operating more closely with neighbouring LAs to deliver homes growth. The CS cannot guarantee delivery of the Country Park in a timely manner and so demonstrate it will not adversely affect the integrity of a European designated habitat. For soundness, policy CS10 and Infrastructure Table 8B need to be revised. Allocating the entire Northern Fringe for immediate development through multi-site starts is a high risk strategy that will result in severe traffic congestion for both North Ipswich and the town centre and will damage the future attractiveness and prosperity of town. With so few new jobs being created in the town centre, residents will have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements. In response to a planning application by Mersea Homes /CBRE Global Investors for the first phase of the Ipswich Garden Suburb, Suffolk County Council stated with regard to traffic '... the development has a severe impact on network performance and travel time.' IBC has been pinning their hopes on getting people out of their cars and onto public transport but with so few new jobs being created in the town centre, residents will mainly have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements and capacity such as a northern bypass or link road. New measures will also be required to ensure air quality does not deteriorate.
See attached.
Object
Proposed Submission Core Strategy and Policies Development Plan Document Review
Representation ID: 23496
Received: 25/02/2015
Respondent: Mr Derek Ford
Legally compliant? Not specified
Sound? No
Duty to co-operate? Not specified
It's unsound to allocate the entire Northern Fringe when its delivery may not be viable over the plan timescales. The CS should be based on co-operating more closely with neighbouring LAs to deliver homes growth.
It is unsound to allocate the entire Northern Fringe when its delivery may not be viable over the plan timescales. To lower this risk the CS should include a plan based on co-operating more closely with neighbouring LAs to deliver homes growth. The CS cannot guarantee delivery of the Country Park in a timely manner and so demonstrate it will not adversely affect the integrity of a European designated habitat. For soundness, policy CS10 and Infrastructure Table 8B need to be revised. Allocating the entire Northern Fringe for immediate development through multi-site starts is a high risk strategy that will result in severe traffic congestion for both North Ipswich and the town centre and will damage the future attractiveness and prosperity of town. With so few new jobs being created in the town centre, residents will have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements. In response to a planning application by Mersea Homes /CBRE Global Investors for the first phase of the Ipswich Garden Suburb, Suffolk County Council stated with regard to traffic '... the development has a severe impact on network performance and travel time.' IBC has been pinning their hopes on getting people out of their cars and onto public transport but with so few new jobs being created in the town centre, resident will mainly have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements and capacity such as a northern bypass or link road. New measures will also be required to ensure air quality does not deteriorate.
See attached.
Object
Proposed Submission Core Strategy and Policies Development Plan Document Review
Representation ID: 23502
Received: 25/02/2015
Respondent: Mr Derek Ford
Legally compliant? Not specified
Sound? No
Duty to co-operate? Not specified
The CS cannot guarantee delivery of the Country Park in a timely manner and so demonstrate it will not harm the integrity of a European designated habitat. CS10 and table 8B need to be revised.
See attached.
Object
Proposed Submission Core Strategy and Policies Development Plan Document Review
Representation ID: 23508
Received: 25/02/2015
Respondent: Ipswich Wildlife Group
Legally compliant? Not specified
Sound? No
Duty to co-operate? Not specified
It is unsound to allocate the entire Northern Fringe when its delivery may not be viable over the plan timescales. To lower this risk the CS should include a plan based on co-operating more closely with neighbouring LAs to deliver homes growth. The CS cannot guarantee delivery of the Country Park in a timely manner and so demonstrate it will not adversely affect the integrity of a European designated habitat. For soundness, policy CS10 and Infrastructure Table 8B need to be revised. Allocating the entire Northern Fringe for immediate development through multi-site starts is a high risk strategy that will result in severe traffic congestion for both North Ipswich and the town centre and will damage the future attractiveness and prosperity of town. With so few new jobs being created in the town centre, residents will have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements. In response to a planning application by Mersea Homes /CBRE Global Investors for the first phase of the Ipswich Garden Suburb, Suffolk County Council stated with regard to traffic '... the development has a severe impact on network performance and travel time.' IBC has been pinning their hopes on getting people out of their cars and onto public transport but with so few new jobs being created in the town centre, residents will mainly have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements and capacity such as a northern bypass or link road. New measures will also be required to ensure air quality does not deteriorate.
See attached.
Object
Proposed Submission Core Strategy and Policies Development Plan Document Review
Representation ID: 23509
Received: 25/02/2015
Respondent: Ipswich Wildlife Group
Legally compliant? Not specified
Sound? No
Duty to co-operate? Not specified
It's unsound to allocate the entire Northern Fringe when its delivery may not be viable over the plan timescales. The CS should be based on co-operating more closely with neighbouring LAs to deliver homes growth.
It is unsound to allocate the entire Northern Fringe when its delivery may not be viable over the plan timescales. To lower this risk the CS should include a plan based on co-operating more closely with neighbouring LAs to deliver homes growth. The CS cannot guarantee delivery of the Country Park in a timely manner and so demonstrate it will not adversely affect the integrity of a European designated habitat. For soundness, policy CS10 and Infrastructure Table 8B need to be revised. Allocating the entire Northern Fringe for immediate development through multi-site starts is a high risk strategy that will result in severe traffic congestion for both North Ipswich and the town centre and will damage the future attractiveness and prosperity of town. With so few new jobs being created in the town centre, residents will have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements. In response to a planning application by Mersea Homes /CBRE Global Investors for the first phase of the Ipswich Garden Suburb, Suffolk County Council stated with regard to traffic '... the development has a severe impact on network performance and travel time.' IBC has been pinning their hopes on getting people out of their cars and onto public transport but with so few new jobs being created in the town centre, resident will mainly have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements and capacity such as a northern bypass or link road. New measures will also be required to ensure air quality does not deteriorate.
See attached.
Object
Proposed Submission Core Strategy and Policies Development Plan Document Review
Representation ID: 23515
Received: 25/02/2015
Respondent: Ipswich Wildlife Group
Legally compliant? Not specified
Sound? No
Duty to co-operate? Not specified
The CS cannot guarantee delivery of the Country Park in a timely manner and so demonstrate it will not harm the integrity of a European designated habitat. CS10 and table 8B need to be revised.
See attached.
Object
Proposed Submission Core Strategy and Policies Development Plan Document Review
Representation ID: 23521
Received: 25/02/2015
Respondent: Miss Hannah Lawes
Legally compliant? Not specified
Sound? No
Duty to co-operate? Not specified
It is unsound to allocate the entire Northern Fringe when its delivery may not be viable over the plan timescales. To lower this risk the CS should include a plan based on co-operating more closely with neighbouring LAs to deliver homes growth. The CS cannot guarantee delivery of the Country Park in a timely manner and so demonstrate it will not adversely affect the integrity of a European designated habitat. For soundness, policy CS10 and Infrastructure Table 8B need to be revised. Allocating the entire Northern Fringe for immediate development through multi-site starts is a high risk strategy that will result in severe traffic congestion for both North Ipswich and the town centre and will damage the future attractiveness and prosperity of town. With so few new jobs being created in the town centre, residents will have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements. In response to a planning application by Mersea Homes /CBRE Global Investors for the first phase of the Ipswich Garden Suburb, Suffolk County Council stated with regard to traffic '... the development has a severe impact on network performance and travel time.' IBC has been pinning their hopes on getting people out of their cars and onto public transport but with so few new jobs being created in the town centre, residents will mainly have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements and capacity such as a northern bypass or link road. New measures will also be required to ensure air quality does not deteriorate.
See attached.
Object
Proposed Submission Core Strategy and Policies Development Plan Document Review
Representation ID: 23534
Received: 25/02/2015
Respondent: Mr Lee Lawes
Legally compliant? Not specified
Sound? No
Duty to co-operate? Not specified
It is unsound to allocate the entire Northern Fringe when its delivery may not be viable over the plan timescales. To lower this risk the CS should include a plan based on co-operating more closely with neighbouring LAs to deliver homes growth. The CS cannot guarantee delivery of the Country Park in a timely manner and so demonstrate it will not adversely affect the integrity of a European designated habitat. For soundness, policy CS10 and Infrastructure Table 8B need to be revised. Allocating the entire Northern Fringe for immediate development through multi-site starts is a high risk strategy that will result in severe traffic congestion for both North Ipswich and the town centre and will damage the future attractiveness and prosperity of town. With so few new jobs being created in the town centre, residents will have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements. In response to a planning application by Mersea Homes /CBRE Global Investors for the first phase of the Ipswich Garden Suburb, Suffolk County Council stated with regard to traffic '... the development has a severe impact on network performance and travel time.' IBC has been pinning their hopes on getting people out of their cars and onto public transport but with so few new jobs being created in the town centre, residents will mainly have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements and capacity such as a northern bypass or link road. New measures will also be required to ensure air quality does not deteriorate.
See attached.
Object
Proposed Submission Core Strategy and Policies Development Plan Document Review
Representation ID: 23547
Received: 25/02/2015
Respondent: Mrs Cindy Lawes
Legally compliant? Not specified
Sound? No
Duty to co-operate? Not specified
It is unsound to allocate the entire Northern Fringe when its delivery may not be viable over the plan timescales. To lower this risk the CS should include a plan based on co-operating more closely with neighbouring LAs to deliver homes growth. The CS cannot guarantee delivery of the Country Park in a timely manner and so demonstrate it will not adversely affect the integrity of a European designated habitat. For soundness, policy CS10 and Infrastructure Table 8B need to be revised. Allocating the entire Northern Fringe for immediate development through multi-site starts is a high risk strategy that will result in severe traffic congestion for both North Ipswich and the town centre and will damage the future attractiveness and prosperity of town. With so few new jobs being created in the town centre, residents will have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements. In response to a planning application by Mersea Homes /CBRE Global Investors for the first phase of the Ipswich Garden Suburb, Suffolk County Council stated with regard to traffic '... the development has a severe impact on network performance and travel time.' IBC has been pinning their hopes on getting people out of their cars and onto public transport but with so few new jobs being created in the town centre, residents will mainly have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements and capacity such as a northern bypass or link road. New measures will also be required to ensure air quality does not deteriorate.
See attached.
Object
Proposed Submission Core Strategy and Policies Development Plan Document Review
Representation ID: 23560
Received: 25/02/2015
Respondent: Mrs Jane Tywndale-Biscoe
Legally compliant? Not specified
Sound? No
Duty to co-operate? Not specified
It is unsound to allocate the entire Northern Fringe when its delivery may not be viable over the plan timescales. To lower this risk the CS should include a plan based on co-operating more closely with neighbouring LAs to deliver homes growth. Unsure whether the CS can guarantee delivery of the Country Park in a timely manner and so demonstrate it will not adversely affect the integrity of a European designated habitat. For soundness, policy CS10 and Infrastructure Table 8B need to be revised. Allocating the entire Northern Fringe for immediate development through multi-site starts is a high risk strategy that will result in severe traffic congestion for both North Ipswich and the town centre and will damage the future attractiveness and prosperity of town. With so few new jobs being created in the town centre, residents will have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements. In response to a planning application by Mersea Homes /CBRE Global Investors for the first phase of the Ipswich Garden Suburb, Suffolk County Council stated with regard to traffic '... the development has a severe impact on network performance and travel time.' IBC has been pinning their hopes on getting people out of their cars and onto public transport but with so few new jobs being created in the town centre, resident will mainly have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements and capacity such as a northern bypass or link road. New measures will also be required to ensure air quality does not deteriorate.
See attached.
Object
Proposed Submission Core Strategy and Policies Development Plan Document Review
Representation ID: 23573
Received: 25/02/2015
Respondent: Mr Robert Ian Bullock
Legally compliant? Not specified
Sound? No
Duty to co-operate? Not specified
It is unsound to allocate the entire Northern Fringe when its delivery may not be viable over the plan timescales. To lower this risk the CS should include a plan based on co-operating more closely with neighbouring LAs to deliver homes growth. The CS cannot guarantee delivery of the Country Park in a timely manner and so demonstrate it will not adversely affect the integrity of a European designated habitat. For soundness, policy CS10 and Infrastructure Table 8B need to be revised. Allocating the entire Northern Fringe for immediate development through multi-site starts is a high risk strategy that will result in severe traffic congestion for both North Ipswich and the town centre and will damage the future attractiveness and prosperity of town. With so few new jobs being created in the town centre, residents will have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements. In response to a planning application by Mersea Homes /CBRE Global Investors for the first phase of the Ipswich Garden Suburb, Suffolk County Council stated with regard to traffic '... the development has a severe impact on network performance and travel time.' IBC has been pinning their hopes on getting people out of their cars and onto public transport but with so few new jobs being created in the town centre, residents will mainly have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements and capacity such as a northern bypass or link road. New measures will also be required to ensure air quality does not deteriorate.
See attached.
Object
Proposed Submission Core Strategy and Policies Development Plan Document Review
Representation ID: 23580
Received: 25/02/2015
Respondent: Mr Robert Ian Bullock
Legally compliant? Not specified
Sound? No
Duty to co-operate? Not specified
The CS cannot guarantee delivery of the Country Park in a timely manner and so demonstrate it will not harm the integrity of a European designated habitat. CS10 and table 8B need to be revised.
See attached.
Object
Proposed Submission Core Strategy and Policies Development Plan Document Review
Representation ID: 23586
Received: 25/02/2015
Respondent: Mrs Bridget Bullock
Legally compliant? Not specified
Sound? No
Duty to co-operate? Not specified
It is unsound to allocate the entire Northern Fringe when its delivery may not be viable over the plan timescales. To lower this risk the CS should include a plan based on co-operating more closely with neighbouring LAs to deliver homes growth. The CS cannot guarantee delivery of the Country Park in a timely manner and so demonstrate it will not adversely affect the integrity of a European designated habitat. For soundness, policy CS10 and Infrastructure Table 8B need to be revised. Allocating the entire Northern Fringe for immediate development through multi-site starts is a high risk strategy that will result in severe traffic congestion for both North Ipswich and the town centre and will damage the future attractiveness and prosperity of town. With so few new jobs being created in the town centre, residents will have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements. In response to a planning application by Mersea Homes /CBRE Global Investors for the first phase of the Ipswich Garden Suburb, Suffolk County Council stated with regard to traffic '... the development has a severe impact on network performance and travel time.' IBC has been pinning their hopes on getting people out of their cars and onto public transport but with so few new jobs being created in the town centre, residents will mainly have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements and capacity such as a northern bypass or link road. New measures will also be required to ensure air quality does not deteriorate.
See attached.