ipswich.gov.uk

CS10: Ipswich Garden Suburb

Showing comments and forms 991 to 1020 of 1091

Object

Proposed Submission Core Strategy and Policies Development Plan Document Review

Representation ID: 23326

Received: 25/02/2015

Respondent: Ms Elspeth MacFadyen

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

It is unsound to allocate the entire Northern Fringe when its delivery may not be viable over the plan timescales. To lower this risk the CS should include a plan based on co-operating more closely with neighbouring LAs to deliver homes growth. The CS cannot guarantee delivery of the Country Park in a timely manner and so demonstrate it will not adversely affect the integrity of a European designated habitat. For soundness, policy CS10 and Infrastructure Table 8B need to be revised. Allocating the entire Northern Fringe for immediate development through multi-site starts is a high risk strategy that will result in severe traffic congestion for both North Ipswich and the town centre and will damage the future attractiveness and prosperity of town. With so few new jobs being created in the town centre, residents will have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements. In response to a planning application by Mersea Homes /CBRE Global Investors for the first phase of the Ipswich Garden Suburb, Suffolk County Council stated with regard to traffic '... the development has a severe impact on network performance and travel time.' IBC has been pinning their hopes on getting people out of their cars and onto public transport but with so few new jobs being created in the town centre, residents will mainly have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements and capacity such as a northern bypass or link road. New measures will also be required to ensure air quality does not deteriorate.

Full text:

See attached.

Object

Proposed Submission Core Strategy and Policies Development Plan Document Review

Representation ID: 23339

Received: 25/02/2015

Respondent: Mr Tom Cheen

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

It is unsound to allocate the entire Northern Fringe when its delivery may not be viable over the plan timescales. To lower this risk the CS should include a plan based on co-operating more closely with neighbouring LAs to deliver homes growth. The CS cannot guarantee delivery of the Country Park in a timely manner and so demonstrate it will not adversely affect the integrity of a European designated habitat. For soundness, policy CS10 and Infrastructure Table 8B need to be revised. Allocating the entire Northern Fringe for immediate development through multi-site starts is a high risk strategy that will result in severe traffic congestion for both North Ipswich and the town centre and will damage the future attractiveness and prosperity of town. With so few new jobs being created in the town centre, residents will have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements. In response to a planning application by Mersea Homes /CBRE Global Investors for the first phase of the Ipswich Garden Suburb, Suffolk County Council stated with regard to traffic '... the development has a severe impact on network performance and travel time.' IBC has been pinning their hopes on getting people out of their cars and onto public transport but with so few new jobs being created in the town centre, residents will mainly have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements and capacity such as a northern bypass or link road. New measures will also be required to ensure air quality does not deteriorate.

Full text:

See attached.

Object

Proposed Submission Core Strategy and Policies Development Plan Document Review

Representation ID: 23352

Received: 25/02/2015

Respondent: Miss Sarah Jennings

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

It is unsound to allocate the entire Northern Fringe when its delivery may not be viable over the plan timescales. To lower this risk the CS should include a plan based on co-operating more closely with neighbouring LAs to deliver homes growth. The CS cannot guarantee delivery of the Country Park in a timely manner and so demonstrate it will not adversely affect the integrity of a European designated habitat. For soundness, policy CS10 and Infrastructure Table 8B need to be revised. Allocating the entire Northern Fringe for immediate development through multi-site starts is a high risk strategy that will result in severe traffic congestion for both North Ipswich and the town centre and will damage the future attractiveness and prosperity of town. With so few new jobs being created in the town centre, residents will have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements. In response to a planning application by Mersea Homes /CBRE Global Investors for the first phase of the Ipswich Garden Suburb, Suffolk County Council stated with regard to traffic '... the development has a severe impact on network performance and travel time.' IBC has been pinning their hopes on getting people out of their cars and onto public transport but with so few new jobs being created in the town centre, residents will mainly have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements and capacity such as a northern bypass or link road. New measures will also be required to ensure air quality does not deteriorate.

Full text:

See attached.

Object

Proposed Submission Core Strategy and Policies Development Plan Document Review

Representation ID: 23365

Received: 25/02/2015

Respondent: Mr Brian Morris

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

It is unsound to allocate the entire Northern Fringe when its delivery may not be viable over the plan timescales. To lower this risk the CS should include a plan based on co-operating more closely with neighbouring LAs to deliver homes growth. The CS cannot guarantee delivery of the Country Park in a timely manner and so demonstrate it will not adversely affect the integrity of a European designated habitat. For soundness, policy CS10 and Infrastructure Table 8B need to be revised. Allocating the entire Northern Fringe for immediate development through multi-site starts is a high risk strategy that will result in severe traffic congestion for both North Ipswich and the town centre and will damage the future attractiveness and prosperity of town. With so few new jobs being created in the town centre, residents will have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements. In response to a planning application by Mersea Homes /CBRE Global Investors for the first phase of the Ipswich Garden Suburb, Suffolk County Council stated with regard to traffic '... the development has a severe impact on network performance and travel time.' IBC has been pinning their hopes on getting people out of their cars and onto public transport but with so few new jobs being created in the town centre, residents will mainly have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements and capacity such as a northern bypass or link road. New measures will also be required to ensure air quality does not deteriorate.

Full text:

See attached.

Object

Proposed Submission Core Strategy and Policies Development Plan Document Review

Representation ID: 23366

Received: 25/02/2015

Respondent: Mr Brian Morris

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

It's unsound to allocate the entire Northern Fringe when its delivery may not be viable over the plan timescales. The CS should be based on co-operating more closely with neighbouring LAs to deliver homes growth.
It is unsound to allocate the entire Northern Fringe when its delivery may not be viable over the plan timescales. To lower this risk the CS should include a plan based on co-operating more closely with neighbouring LAs to deliver homes growth. The CS cannot guarantee delivery of the Country Park in a timely manner and so demonstrate it will not adversely affect the integrity of a European designated habitat. For soundness, policy CS10 and Infrastructure Table 8B need to be revised. Allocating the entire Northern Fringe for immediate development through multi-site starts is a high risk strategy that will result in severe traffic congestion for both North Ipswich and the town centre and will damage the future attractiveness and prosperity of town. With so few new jobs being created in the town centre, residents will have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements. In response to a planning application by Mersea Homes /CBRE Global Investors for the first phase of the Ipswich Garden Suburb, Suffolk County Council stated with regard to traffic '... the development has a severe impact on network performance and travel time.' IBC has been pinning their hopes on getting people out of their cars and onto public transport but with so few new jobs being created in the town centre, resident will mainly have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements and capacity such as a northern bypass or link road. New measures will also be required to ensure air quality does not deteriorate.

Full text:

See attached.

Object

Proposed Submission Core Strategy and Policies Development Plan Document Review

Representation ID: 23372

Received: 25/02/2015

Respondent: Mr Brian Morris

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

The CS cannot guarantee delivery of the Country Park in a timely manner and so demonstrate it will not harm the integrity of a European designated habitat. CS10 and table 8B need to be revised.

Full text:

See attached.

Object

Proposed Submission Core Strategy and Policies Development Plan Document Review

Representation ID: 23378

Received: 25/02/2015

Respondent: Mr Roger Holt

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

It is unsound to allocate the entire Northern Fringe when its delivery may not be viable over the plan timescales. To lower this risk the CS should include a plan based on co-operating more closely with neighbouring LAs to deliver homes growth. The CS cannot guarantee delivery of the Country Park in a timely manner and so demonstrate it will not adversely affect the integrity of a European designated habitat. For soundness, policy CS10 and Infrastructure Table 8B need to be revised. Allocating the entire Northern Fringe for immediate development through multi-site starts is a high risk strategy that will result in severe traffic congestion for both North Ipswich and the town centre and will damage the future attractiveness and prosperity of town. With so few new jobs being created in the town centre, residents will have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements. In response to a planning application by Mersea Homes /CBRE Global Investors for the first phase of the Ipswich Garden Suburb, Suffolk County Council stated with regard to traffic '... the development has a severe impact on network performance and travel time.' IBC has been pinning their hopes on getting people out of their cars and onto public transport but with so few new jobs being created in the town centre, residents will mainly have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements and capacity such as a northern bypass or link road. New measures will also be required to ensure air quality does not deteriorate.

Full text:

See attached.

Object

Proposed Submission Core Strategy and Policies Development Plan Document Review

Representation ID: 23391

Received: 25/02/2015

Respondent: Mrs Gillian Holt

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

It is unsound to allocate the entire Northern Fringe when its delivery may not be viable over the plan timescales. To lower this risk the CS should include a plan based on co-operating more closely with neighbouring LAs to deliver homes growth. The CS cannot guarantee delivery of the Country Park in a timely manner and so demonstrate it will not adversely affect the integrity of a European designated habitat. For soundness, policy CS10 and Infrastructure Table 8B need to be revised. Allocating the entire Northern Fringe for immediate development through multi-site starts is a high risk strategy that will result in severe traffic congestion for both North Ipswich and the town centre and will damage the future attractiveness and prosperity of town. With so few new jobs being created in the town centre, residents will have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements. In response to a planning application by Mersea Homes /CBRE Global Investors for the first phase of the Ipswich Garden Suburb, Suffolk County Council stated with regard to traffic '... the development has a severe impact on network performance and travel time.' IBC has been pinning their hopes on getting people out of their cars and onto public transport but with so few new jobs being created in the town centre, residents will mainly have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements and capacity such as a northern bypass or link road. New measures will also be required to ensure air quality does not deteriorate.

Full text:

See attached.

Object

Proposed Submission Core Strategy and Policies Development Plan Document Review

Representation ID: 23404

Received: 25/02/2015

Respondent: Mr Colin Bennett

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

It is unsound to allocate the entire Northern Fringe when its delivery may not be viable over the plan timescales. To lower this risk the CS should include a plan based on co-operating more closely with neighbouring LAs to deliver homes growth. The CS cannot guarantee delivery of the Country Park in a timely manner and so demonstrate it will not adversely affect the integrity of a European designated habitat. For soundness, policy CS10 and Infrastructure Table 8B need to be revised. Allocating the entire Northern Fringe for immediate development through multi-site starts is a high risk strategy that will result in severe traffic congestion for both North Ipswich and the town centre and will damage the future attractiveness and prosperity of town. With so few new jobs being created in the town centre, residents will have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements. In response to a planning application by Mersea Homes /CBRE Global Investors for the first phase of the Ipswich Garden Suburb, Suffolk County Council stated with regard to traffic '... the development has a severe impact on network performance and travel time.' IBC has been pinning their hopes on getting people out of their cars and onto public transport but with so few new jobs being created in the town centre, residents will mainly have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements and capacity such as a northern bypass or link road. New measures will also be required to ensure air quality does not deteriorate.

Full text:

See attached.

Object

Proposed Submission Core Strategy and Policies Development Plan Document Review

Representation ID: 23411

Received: 25/02/2015

Respondent: Mr Colin Bennett

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

The CS cannot guarantee delivery of the Country Park in a timely manner and so demonstrate it will not harm the integrity of a European designated habitat. CS10 and table 8B need to be revised.

Full text:

See attached.

Object

Proposed Submission Core Strategy and Policies Development Plan Document Review

Representation ID: 23418

Received: 25/02/2015

Respondent: Miss Chelsea Bennett

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

It is unsound to allocate the entire Northern Fringe when its delivery may not be viable over the plan timescales. To lower this risk the CS should include a plan based on co-operating more closely with neighbouring LAs to deliver homes growth. The CS cannot guarantee delivery of the Country Park in a timely manner and so demonstrate it will not adversely affect the integrity of a European designated habitat. For soundness, policy CS10 and Infrastructure Table 8B need to be revised. Allocating the entire Northern Fringe for immediate development through multi-site starts is a high risk strategy that will result in severe traffic congestion for both North Ipswich and the town centre and will damage the future attractiveness and prosperity of town. With so few new jobs being created in the town centre, residents will have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements. In response to a planning application by Mersea Homes /CBRE Global Investors for the first phase of the Ipswich Garden Suburb, Suffolk County Council stated with regard to traffic '... the development has a severe impact on network performance and travel time.' IBC has been pinning their hopes on getting people out of their cars and onto public transport but with so few new jobs being created in the town centre, residents will mainly have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements and capacity such as a northern bypass or link road. New measures will also be required to ensure air quality does not deteriorate.

Full text:

See attached.

Object

Proposed Submission Core Strategy and Policies Development Plan Document Review

Representation ID: 23430

Received: 25/02/2015

Respondent: Mrs J Cole-Jones

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

It is unsound to allocate the entire Northern Fringe when its delivery may not be viable over the plan timescales. To lower this risk the CS should include a plan based on co-operating more closely with neighbouring LAs to deliver homes growth. The CS cannot guarantee delivery of the Country Park in a timely manner and so demonstrate it will not adversely affect the integrity of a European designated habitat. For soundness, policy CS10 and Infrastructure Table 8B need to be revised. Allocating the entire Northern Fringe for immediate development through multi-site starts is a high risk strategy that will result in severe traffic congestion for both North Ipswich and the town centre and will damage the future attractiveness and prosperity of town. With so few new jobs being created in the town centre, residents will have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements. In response to a planning application by Mersea Homes /CBRE Global Investors for the first phase of the Ipswich Garden Suburb, Suffolk County Council stated with regard to traffic '... the development has a severe impact on network performance and travel time.' IBC has been pinning their hopes on getting people out of their cars and onto public transport but with so few new jobs being created in the town centre, residents will mainly have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements and capacity such as a northern bypass or link road. New measures will also be required to ensure air quality does not deteriorate.

Full text:

See attached.

Object

Proposed Submission Core Strategy and Policies Development Plan Document Review

Representation ID: 23437

Received: 25/02/2015

Respondent: Mrs J Cole-Jones

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

The CS cannot guarantee delivery of the Country Park in a timely manner and so demonstrate it will not harm the integrity of a European designated habitat. CS10 and table 8B need to be revised.

Full text:

See attached.

Object

Proposed Submission Core Strategy and Policies Development Plan Document Review

Representation ID: 23443

Received: 25/02/2015

Respondent: Mr & Mrs T B Strutt

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

It is unsound to allocate the entire Northern Fringe when its delivery may not be viable over the plan timescales. To lower this risk the CS should include a plan based on co-operating more closely with neighbouring LAs to deliver homes growth. The CS cannot guarantee delivery of the Country Park in a timely manner and so demonstrate it will not adversely affect the integrity of a European designated habitat. For soundness, policy CS10 and Infrastructure Table 8B need to be revised. Allocating the entire Northern Fringe for immediate development through multi-site starts is a high risk strategy that will result in severe traffic congestion for both North Ipswich and the town centre and will damage the future attractiveness and prosperity of town. With so few new jobs being created in the town centre, residents will have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements. In response to a planning application by Mersea Homes /CBRE Global Investors for the first phase of the Ipswich Garden Suburb, Suffolk County Council stated with regard to traffic '... the development has a severe impact on network performance and travel time.' IBC has been pinning their hopes on getting people out of their cars and onto public transport but with so few new jobs being created in the town centre, residents will mainly have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements and capacity such as a northern bypass or link road. New measures will also be required to ensure air quality does not deteriorate.

Full text:

See attached.

Object

Proposed Submission Core Strategy and Policies Development Plan Document Review

Representation ID: 23456

Received: 25/02/2015

Respondent: Mr & Mrs T B Strutt

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

It is unsound to allocate the entire Northern Fringe when its delivery may not be viable over the plan timescales. To lower this risk the CS should include a plan based on co-operating more closely with neighbouring LAs to deliver homes growth. The CS cannot guarantee delivery of the Country Park in a timely manner and so demonstrate it will not adversely affect the integrity of a European designated habitat. For soundness, policy CS10 and Infrastructure Table 8B need to be revised. Allocating the entire Northern Fringe for immediate development through multi-site starts is a high risk strategy that will result in severe traffic congestion for both North Ipswich and the town centre and will damage the future attractiveness and prosperity of town. With so few new jobs being created in the town centre, residents will have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements. In response to a planning application by Mersea Homes /CBRE Global Investors for the first phase of the Ipswich Garden Suburb, Suffolk County Council stated with regard to traffic '... the development has a severe impact on network performance and travel time.' IBC has been pinning their hopes on getting people out of their cars and onto public transport but with so few new jobs being created in the town centre, residents will mainly have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements and capacity such as a northern bypass or link road. New measures will also be required to ensure air quality does not deteriorate.

Full text:

See attached.

Object

Proposed Submission Core Strategy and Policies Development Plan Document Review

Representation ID: 23469

Received: 25/02/2015

Respondent: Mr Barry Tooke

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

It is unsound to allocate the entire Northern Fringe when its delivery may not be viable over the plan timescales. To lower this risk the CS should include a plan based on co-operating more closely with neighbouring LAs to deliver homes growth. The CS cannot guarantee delivery of the Country Park in a timely manner and so demonstrate it will not adversely affect the integrity of a European designated habitat. For soundness, policy CS10 and Infrastructure Table 8B need to be revised. Allocating the entire Northern Fringe for immediate development through multi-site starts is a high risk strategy that will result in severe traffic congestion for both North Ipswich and the town centre and will damage the future attractiveness and prosperity of town. With so few new jobs being created in the town centre, residents will have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements. In response to a planning application by Mersea Homes /CBRE Global Investors for the first phase of the Ipswich Garden Suburb, Suffolk County Council stated with regard to traffic '... the development has a severe impact on network performance and travel time.' IBC has been pinning their hopes on getting people out of their cars and onto public transport but with so few new jobs being created in the town centre, residents will mainly have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements and capacity such as a northern bypass or link road. New measures will also be required to ensure air quality does not deteriorate.

Full text:

See attached.

Object

Proposed Submission Core Strategy and Policies Development Plan Document Review

Representation ID: 23482

Received: 25/02/2015

Respondent: Mrs Lesley Tooke

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

It is unsound to allocate the entire Northern Fringe when its delivery may not be viable over the plan timescales. To lower this risk the CS should include a plan based on co-operating more closely with neighbouring LAs to deliver homes growth. The CS cannot guarantee delivery of the Country Park in a timely manner and so demonstrate it will not adversely affect the integrity of a European designated habitat. For soundness, policy CS10 and Infrastructure Table 8B need to be revised. Allocating the entire Northern Fringe for immediate development through multi-site starts is a high risk strategy that will result in severe traffic congestion for both North Ipswich and the town centre and will damage the future attractiveness and prosperity of town. With so few new jobs being created in the town centre, residents will have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements. In response to a planning application by Mersea Homes /CBRE Global Investors for the first phase of the Ipswich Garden Suburb, Suffolk County Council stated with regard to traffic '... the development has a severe impact on network performance and travel time.' IBC has been pinning their hopes on getting people out of their cars and onto public transport but with so few new jobs being created in the town centre, residents will mainly have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements and capacity such as a northern bypass or link road. New measures will also be required to ensure air quality does not deteriorate.

Full text:

See attached.

Object

Proposed Submission Core Strategy and Policies Development Plan Document Review

Representation ID: 23495

Received: 25/02/2015

Respondent: Mr Derek Ford

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

It is unsound to allocate the entire Northern Fringe when its delivery may not be viable over the plan timescales. To lower this risk the CS should include a plan based on co-operating more closely with neighbouring LAs to deliver homes growth. The CS cannot guarantee delivery of the Country Park in a timely manner and so demonstrate it will not adversely affect the integrity of a European designated habitat. For soundness, policy CS10 and Infrastructure Table 8B need to be revised. Allocating the entire Northern Fringe for immediate development through multi-site starts is a high risk strategy that will result in severe traffic congestion for both North Ipswich and the town centre and will damage the future attractiveness and prosperity of town. With so few new jobs being created in the town centre, residents will have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements. In response to a planning application by Mersea Homes /CBRE Global Investors for the first phase of the Ipswich Garden Suburb, Suffolk County Council stated with regard to traffic '... the development has a severe impact on network performance and travel time.' IBC has been pinning their hopes on getting people out of their cars and onto public transport but with so few new jobs being created in the town centre, residents will mainly have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements and capacity such as a northern bypass or link road. New measures will also be required to ensure air quality does not deteriorate.

Full text:

See attached.

Object

Proposed Submission Core Strategy and Policies Development Plan Document Review

Representation ID: 23496

Received: 25/02/2015

Respondent: Mr Derek Ford

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

It's unsound to allocate the entire Northern Fringe when its delivery may not be viable over the plan timescales. The CS should be based on co-operating more closely with neighbouring LAs to deliver homes growth.
It is unsound to allocate the entire Northern Fringe when its delivery may not be viable over the plan timescales. To lower this risk the CS should include a plan based on co-operating more closely with neighbouring LAs to deliver homes growth. The CS cannot guarantee delivery of the Country Park in a timely manner and so demonstrate it will not adversely affect the integrity of a European designated habitat. For soundness, policy CS10 and Infrastructure Table 8B need to be revised. Allocating the entire Northern Fringe for immediate development through multi-site starts is a high risk strategy that will result in severe traffic congestion for both North Ipswich and the town centre and will damage the future attractiveness and prosperity of town. With so few new jobs being created in the town centre, residents will have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements. In response to a planning application by Mersea Homes /CBRE Global Investors for the first phase of the Ipswich Garden Suburb, Suffolk County Council stated with regard to traffic '... the development has a severe impact on network performance and travel time.' IBC has been pinning their hopes on getting people out of their cars and onto public transport but with so few new jobs being created in the town centre, resident will mainly have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements and capacity such as a northern bypass or link road. New measures will also be required to ensure air quality does not deteriorate.

Full text:

See attached.

Object

Proposed Submission Core Strategy and Policies Development Plan Document Review

Representation ID: 23502

Received: 25/02/2015

Respondent: Mr Derek Ford

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

The CS cannot guarantee delivery of the Country Park in a timely manner and so demonstrate it will not harm the integrity of a European designated habitat. CS10 and table 8B need to be revised.

Full text:

See attached.

Object

Proposed Submission Core Strategy and Policies Development Plan Document Review

Representation ID: 23508

Received: 25/02/2015

Respondent: Ipswich Wildlife Group

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

It is unsound to allocate the entire Northern Fringe when its delivery may not be viable over the plan timescales. To lower this risk the CS should include a plan based on co-operating more closely with neighbouring LAs to deliver homes growth. The CS cannot guarantee delivery of the Country Park in a timely manner and so demonstrate it will not adversely affect the integrity of a European designated habitat. For soundness, policy CS10 and Infrastructure Table 8B need to be revised. Allocating the entire Northern Fringe for immediate development through multi-site starts is a high risk strategy that will result in severe traffic congestion for both North Ipswich and the town centre and will damage the future attractiveness and prosperity of town. With so few new jobs being created in the town centre, residents will have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements. In response to a planning application by Mersea Homes /CBRE Global Investors for the first phase of the Ipswich Garden Suburb, Suffolk County Council stated with regard to traffic '... the development has a severe impact on network performance and travel time.' IBC has been pinning their hopes on getting people out of their cars and onto public transport but with so few new jobs being created in the town centre, residents will mainly have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements and capacity such as a northern bypass or link road. New measures will also be required to ensure air quality does not deteriorate.

Full text:

See attached.

Object

Proposed Submission Core Strategy and Policies Development Plan Document Review

Representation ID: 23509

Received: 25/02/2015

Respondent: Ipswich Wildlife Group

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

It's unsound to allocate the entire Northern Fringe when its delivery may not be viable over the plan timescales. The CS should be based on co-operating more closely with neighbouring LAs to deliver homes growth.
It is unsound to allocate the entire Northern Fringe when its delivery may not be viable over the plan timescales. To lower this risk the CS should include a plan based on co-operating more closely with neighbouring LAs to deliver homes growth. The CS cannot guarantee delivery of the Country Park in a timely manner and so demonstrate it will not adversely affect the integrity of a European designated habitat. For soundness, policy CS10 and Infrastructure Table 8B need to be revised. Allocating the entire Northern Fringe for immediate development through multi-site starts is a high risk strategy that will result in severe traffic congestion for both North Ipswich and the town centre and will damage the future attractiveness and prosperity of town. With so few new jobs being created in the town centre, residents will have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements. In response to a planning application by Mersea Homes /CBRE Global Investors for the first phase of the Ipswich Garden Suburb, Suffolk County Council stated with regard to traffic '... the development has a severe impact on network performance and travel time.' IBC has been pinning their hopes on getting people out of their cars and onto public transport but with so few new jobs being created in the town centre, resident will mainly have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements and capacity such as a northern bypass or link road. New measures will also be required to ensure air quality does not deteriorate.

Full text:

See attached.

Object

Proposed Submission Core Strategy and Policies Development Plan Document Review

Representation ID: 23515

Received: 25/02/2015

Respondent: Ipswich Wildlife Group

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

The CS cannot guarantee delivery of the Country Park in a timely manner and so demonstrate it will not harm the integrity of a European designated habitat. CS10 and table 8B need to be revised.

Full text:

See attached.

Object

Proposed Submission Core Strategy and Policies Development Plan Document Review

Representation ID: 23521

Received: 25/02/2015

Respondent: Miss Hannah Lawes

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

It is unsound to allocate the entire Northern Fringe when its delivery may not be viable over the plan timescales. To lower this risk the CS should include a plan based on co-operating more closely with neighbouring LAs to deliver homes growth. The CS cannot guarantee delivery of the Country Park in a timely manner and so demonstrate it will not adversely affect the integrity of a European designated habitat. For soundness, policy CS10 and Infrastructure Table 8B need to be revised. Allocating the entire Northern Fringe for immediate development through multi-site starts is a high risk strategy that will result in severe traffic congestion for both North Ipswich and the town centre and will damage the future attractiveness and prosperity of town. With so few new jobs being created in the town centre, residents will have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements. In response to a planning application by Mersea Homes /CBRE Global Investors for the first phase of the Ipswich Garden Suburb, Suffolk County Council stated with regard to traffic '... the development has a severe impact on network performance and travel time.' IBC has been pinning their hopes on getting people out of their cars and onto public transport but with so few new jobs being created in the town centre, residents will mainly have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements and capacity such as a northern bypass or link road. New measures will also be required to ensure air quality does not deteriorate.

Full text:

See attached.

Object

Proposed Submission Core Strategy and Policies Development Plan Document Review

Representation ID: 23534

Received: 25/02/2015

Respondent: Mr Lee Lawes

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

It is unsound to allocate the entire Northern Fringe when its delivery may not be viable over the plan timescales. To lower this risk the CS should include a plan based on co-operating more closely with neighbouring LAs to deliver homes growth. The CS cannot guarantee delivery of the Country Park in a timely manner and so demonstrate it will not adversely affect the integrity of a European designated habitat. For soundness, policy CS10 and Infrastructure Table 8B need to be revised. Allocating the entire Northern Fringe for immediate development through multi-site starts is a high risk strategy that will result in severe traffic congestion for both North Ipswich and the town centre and will damage the future attractiveness and prosperity of town. With so few new jobs being created in the town centre, residents will have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements. In response to a planning application by Mersea Homes /CBRE Global Investors for the first phase of the Ipswich Garden Suburb, Suffolk County Council stated with regard to traffic '... the development has a severe impact on network performance and travel time.' IBC has been pinning their hopes on getting people out of their cars and onto public transport but with so few new jobs being created in the town centre, residents will mainly have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements and capacity such as a northern bypass or link road. New measures will also be required to ensure air quality does not deteriorate.

Full text:

See attached.

Object

Proposed Submission Core Strategy and Policies Development Plan Document Review

Representation ID: 23547

Received: 25/02/2015

Respondent: Mrs Cindy Lawes

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

It is unsound to allocate the entire Northern Fringe when its delivery may not be viable over the plan timescales. To lower this risk the CS should include a plan based on co-operating more closely with neighbouring LAs to deliver homes growth. The CS cannot guarantee delivery of the Country Park in a timely manner and so demonstrate it will not adversely affect the integrity of a European designated habitat. For soundness, policy CS10 and Infrastructure Table 8B need to be revised. Allocating the entire Northern Fringe for immediate development through multi-site starts is a high risk strategy that will result in severe traffic congestion for both North Ipswich and the town centre and will damage the future attractiveness and prosperity of town. With so few new jobs being created in the town centre, residents will have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements. In response to a planning application by Mersea Homes /CBRE Global Investors for the first phase of the Ipswich Garden Suburb, Suffolk County Council stated with regard to traffic '... the development has a severe impact on network performance and travel time.' IBC has been pinning their hopes on getting people out of their cars and onto public transport but with so few new jobs being created in the town centre, residents will mainly have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements and capacity such as a northern bypass or link road. New measures will also be required to ensure air quality does not deteriorate.

Full text:

See attached.

Object

Proposed Submission Core Strategy and Policies Development Plan Document Review

Representation ID: 23560

Received: 25/02/2015

Respondent: Mrs Jane Tywndale-Biscoe

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

It is unsound to allocate the entire Northern Fringe when its delivery may not be viable over the plan timescales. To lower this risk the CS should include a plan based on co-operating more closely with neighbouring LAs to deliver homes growth. Unsure whether the CS can guarantee delivery of the Country Park in a timely manner and so demonstrate it will not adversely affect the integrity of a European designated habitat. For soundness, policy CS10 and Infrastructure Table 8B need to be revised. Allocating the entire Northern Fringe for immediate development through multi-site starts is a high risk strategy that will result in severe traffic congestion for both North Ipswich and the town centre and will damage the future attractiveness and prosperity of town. With so few new jobs being created in the town centre, residents will have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements. In response to a planning application by Mersea Homes /CBRE Global Investors for the first phase of the Ipswich Garden Suburb, Suffolk County Council stated with regard to traffic '... the development has a severe impact on network performance and travel time.' IBC has been pinning their hopes on getting people out of their cars and onto public transport but with so few new jobs being created in the town centre, resident will mainly have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements and capacity such as a northern bypass or link road. New measures will also be required to ensure air quality does not deteriorate.

Full text:

See attached.

Object

Proposed Submission Core Strategy and Policies Development Plan Document Review

Representation ID: 23573

Received: 25/02/2015

Respondent: Mr Robert Ian Bullock

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

It is unsound to allocate the entire Northern Fringe when its delivery may not be viable over the plan timescales. To lower this risk the CS should include a plan based on co-operating more closely with neighbouring LAs to deliver homes growth. The CS cannot guarantee delivery of the Country Park in a timely manner and so demonstrate it will not adversely affect the integrity of a European designated habitat. For soundness, policy CS10 and Infrastructure Table 8B need to be revised. Allocating the entire Northern Fringe for immediate development through multi-site starts is a high risk strategy that will result in severe traffic congestion for both North Ipswich and the town centre and will damage the future attractiveness and prosperity of town. With so few new jobs being created in the town centre, residents will have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements. In response to a planning application by Mersea Homes /CBRE Global Investors for the first phase of the Ipswich Garden Suburb, Suffolk County Council stated with regard to traffic '... the development has a severe impact on network performance and travel time.' IBC has been pinning their hopes on getting people out of their cars and onto public transport but with so few new jobs being created in the town centre, residents will mainly have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements and capacity such as a northern bypass or link road. New measures will also be required to ensure air quality does not deteriorate.

Full text:

See attached.

Object

Proposed Submission Core Strategy and Policies Development Plan Document Review

Representation ID: 23580

Received: 25/02/2015

Respondent: Mr Robert Ian Bullock

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

The CS cannot guarantee delivery of the Country Park in a timely manner and so demonstrate it will not harm the integrity of a European designated habitat. CS10 and table 8B need to be revised.

Full text:

See attached.

Object

Proposed Submission Core Strategy and Policies Development Plan Document Review

Representation ID: 23586

Received: 25/02/2015

Respondent: Mrs Bridget Bullock

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

It is unsound to allocate the entire Northern Fringe when its delivery may not be viable over the plan timescales. To lower this risk the CS should include a plan based on co-operating more closely with neighbouring LAs to deliver homes growth. The CS cannot guarantee delivery of the Country Park in a timely manner and so demonstrate it will not adversely affect the integrity of a European designated habitat. For soundness, policy CS10 and Infrastructure Table 8B need to be revised. Allocating the entire Northern Fringe for immediate development through multi-site starts is a high risk strategy that will result in severe traffic congestion for both North Ipswich and the town centre and will damage the future attractiveness and prosperity of town. With so few new jobs being created in the town centre, residents will have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements. In response to a planning application by Mersea Homes /CBRE Global Investors for the first phase of the Ipswich Garden Suburb, Suffolk County Council stated with regard to traffic '... the development has a severe impact on network performance and travel time.' IBC has been pinning their hopes on getting people out of their cars and onto public transport but with so few new jobs being created in the town centre, residents will mainly have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements and capacity such as a northern bypass or link road. New measures will also be required to ensure air quality does not deteriorate.

Full text:

See attached.