ipswich.gov.uk

CS10: Ipswich Garden Suburb

Showing comments and forms 1051 to 1080 of 1091

Object

Proposed Submission Core Strategy and Policies Development Plan Document Review

Representation ID: 23846

Received: 25/02/2015

Respondent: Mr Terry Smith

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

It is unsound to allocate the entire Northern Fringe when its delivery may not be viable over the plan timescales. To lower this risk the CS should include a plan based on co-operating more closely with neighbouring LAs to deliver homes growth. The CS cannot guarantee delivery of the Country Park in a timely manner and so demonstrate it will not adversely affect the integrity of a European designated habitat. For soundness, policy CS10 and Infrastructure Table 8B need to be revised. Allocating the entire Northern Fringe for immediate development through multi-site starts is a high risk strategy that will result in severe traffic congestion for both North Ipswich and the town centre and will damage the future attractiveness and prosperity of town. With so few new jobs being created in the town centre, residents will have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements. In response to a planning application by Mersea Homes /CBRE Global Investors for the first phase of the Ipswich Garden Suburb, Suffolk County Council stated with regard to traffic '... the development has a severe impact on network performance and travel time.' IBC has been pinning their hopes on getting people out of their cars and onto public transport but with so few new jobs being created in the town centre, residents will mainly have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements and capacity such as a northern bypass or link road. New measures will also be required to ensure air quality does not deteriorate.

Full text:

See attached.

Object

Proposed Submission Core Strategy and Policies Development Plan Document Review

Representation ID: 23853

Received: 25/02/2015

Respondent: Mr Terry Smith

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

The CS cannot guarantee delivery of the Country Park in a timely manner and so demonstrate it will not harm the integrity of a European designated habitat. CS10 and table 8B need to be revised.

Full text:

See attached.

Object

Proposed Submission Core Strategy and Policies Development Plan Document Review

Representation ID: 23859

Received: 25/02/2015

Respondent: Mrs Diane Smith

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

It is unsound to allocate the entire Northern Fringe when its delivery may not be viable over the plan timescales. To lower this risk the CS should include a plan based on co-operating more closely with neighbouring LAs to deliver homes growth. The CS cannot guarantee delivery of the Country Park in a timely manner and so demonstrate it will not adversely affect the integrity of a European designated habitat. For soundness, policy CS10 and Infrastructure Table 8B need to be revised. Allocating the entire Northern Fringe for immediate development through multi-site starts is a high risk strategy that will result in severe traffic congestion for both North Ipswich and the town centre and will damage the future attractiveness and prosperity of town. With so few new jobs being created in the town centre, residents will have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements. In response to a planning application by Mersea Homes /CBRE Global Investors for the first phase of the Ipswich Garden Suburb, Suffolk County Council stated with regard to traffic '... the development has a severe impact on network performance and travel time.' IBC has been pinning their hopes on getting people out of their cars and onto public transport but with so few new jobs being created in the town centre, residents will mainly have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements and capacity such as a northern bypass or link road. New measures will also be required to ensure air quality does not deteriorate.

Full text:

See attached.

Object

Proposed Submission Core Strategy and Policies Development Plan Document Review

Representation ID: 23866

Received: 25/02/2015

Respondent: Mrs Diane Smith

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

The CS cannot guarantee delivery of the Country Park in a timely manner and so demonstrate it will not harm the integrity of a European designated habitat. CS10 and table 8B need to be revised.

Full text:

See attached.

Object

Proposed Submission Core Strategy and Policies Development Plan Document Review

Representation ID: 23872

Received: 25/02/2015

Respondent: Mr N Haines

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

It is unsound to allocate the entire Northern Fringe when its delivery may not be viable over the plan timescales. To lower this risk the CS should include a plan based on co-operating more closely with neighbouring LAs to deliver homes growth. The CS cannot guarantee delivery of the Country Park in a timely manner and so demonstrate it will not adversely affect the integrity of a European designated habitat. For soundness, policy CS10 and Infrastructure Table 8B need to be revised. Allocating the entire Northern Fringe for immediate development through multi-site starts is a high risk strategy that will result in severe traffic congestion for both North Ipswich and the town centre and will damage the future attractiveness and prosperity of town. With so few new jobs being created in the town centre, residents will have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements. In response to a planning application by Mersea Homes /CBRE Global Investors for the first phase of the Ipswich Garden Suburb, Suffolk County Council stated with regard to traffic '... the development has a severe impact on network performance and travel time.' IBC has been pinning their hopes on getting people out of their cars and onto public transport but with so few new jobs being created in the town centre, residents will mainly have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements and capacity such as a northern bypass or link road. New measures will also be required to ensure air quality does not deteriorate.

Full text:

See attached.

Object

Proposed Submission Core Strategy and Policies Development Plan Document Review

Representation ID: 23885

Received: 25/02/2015

Respondent: Mrs H M L Haines

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

It is unsound to allocate the entire Northern Fringe when its delivery may not be viable over the plan timescales. To lower this risk the CS should include a plan based on co-operating more closely with neighbouring LAs to deliver homes growth. The CS cannot guarantee delivery of the Country Park in a timely manner and so demonstrate it will not adversely affect the integrity of a European designated habitat. For soundness, policy CS10 and Infrastructure Table 8B need to be revised. Allocating the entire Northern Fringe for immediate development through multi-site starts is a high risk strategy that will result in severe traffic congestion for both North Ipswich and the town centre and will damage the future attractiveness and prosperity of town. With so few new jobs being created in the town centre, residents will have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements. In response to a planning application by Mersea Homes /CBRE Global Investors for the first phase of the Ipswich Garden Suburb, Suffolk County Council stated with regard to traffic '... the development has a severe impact on network performance and travel time.' IBC has been pinning their hopes on getting people out of their cars and onto public transport but with so few new jobs being created in the town centre, residents will mainly have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements and capacity such as a northern bypass or link road. New measures will also be required to ensure air quality does not deteriorate.

Full text:

See attached.

Object

Proposed Submission Core Strategy and Policies Development Plan Document Review

Representation ID: 23910

Received: 24/02/2015

Respondent: Mr Colin Markwell

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

It is unsound to allocate the entire Northern Fringe when its delivery may not be viable over the plan timescales. To lower this risk the CS should include a plan based on co-operating more closely with neighbouring LAs to deliver homes growth. The CS cannot guarantee delivery of the Country Park in a timely manner and so demonstrate it will not adversely affect the integrity of a European designated habitat. For soundness, policy CS10 and Infrastructure Table 8B need to be revised. Allocating the entire Northern Fringe for immediate development through multi-site starts is a high risk strategy that will result in severe traffic congestion for both North Ipswich and the town centre and will damage the future attractiveness and prosperity of town. With so few new jobs being created in the town centre, residents will have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements. In response to a planning application by Mersea Homes /CBRE Global Investors for the first phase of the Ipswich Garden Suburb, Suffolk County Council stated with regard to traffic '... the development has a severe impact on network performance and travel time.' IBC has been pinning their hopes on getting people out of their cars and onto public transport but with so few new jobs being created in the town centre, residents will mainly have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements and capacity such as a northern bypass or link road. New measures will also be required to ensure air quality does not deteriorate.

Full text:

See attached.

Object

Proposed Submission Core Strategy and Policies Development Plan Document Review

Representation ID: 23916

Received: 24/02/2015

Respondent: Mrs Helen Markwell

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

It is unsound to allocate the entire Northern Fringe when its delivery may not be viable over the plan timescales. To lower this risk the CS should include a plan based on co-operating more closely with neighbouring LAs to deliver homes growth. The CS cannot guarantee delivery of the Country Park in a timely manner and so demonstrate it will not adversely affect the integrity of a European designated habitat. For soundness, policy CS10 and Infrastructure Table 8B need to be revised. Allocating the entire Northern Fringe for immediate development through multi-site starts is a high risk strategy that will result in severe traffic congestion for both North Ipswich and the town centre and will damage the future attractiveness and prosperity of town. With so few new jobs being created in the town centre, residents will have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements. In response to a planning application by Mersea Homes /CBRE Global Investors for the first phase of the Ipswich Garden Suburb, Suffolk County Council stated with regard to traffic '... the development has a severe impact on network performance and travel time.' IBC has been pinning their hopes on getting people out of their cars and onto public transport but with so few new jobs being created in the town centre, residents will mainly have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements and capacity such as a northern bypass or link road. New measures will also be required to ensure air quality does not deteriorate.

Full text:

See attached.

Object

Proposed Submission Core Strategy and Policies Development Plan Document Review

Representation ID: 23934

Received: 26/02/2015

Respondent: Mrs Brenda Barnes

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

It is unsound to allocate the entire Northern Fringe when its delivery may not be viable over the plan timescales. To lower this risk the CS should include a plan based on co-operating more closely with neighbouring LAs to deliver homes growth. The CS cannot guarantee delivery of the Country Park in a timely manner and so demonstrate it will not adversely affect the integrity of a European designated habitat. For soundness, policy CS10 and Infrastructure Table 8B need to be revised. Allocating the entire Northern Fringe for immediate development through multi-site starts is a high risk strategy that will result in severe traffic congestion for both North Ipswich and the town centre and will damage the future attractiveness and prosperity of town. With so few new jobs being created in the town centre, residents will have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements. In response to a planning application by Mersea Homes /CBRE Global Investors for the first phase of the Ipswich Garden Suburb, Suffolk County Council stated with regard to traffic '... the development has a severe impact on network performance and travel time.' IBC has been pinning their hopes on getting people out of their cars and onto public transport but with so few new jobs being created in the town centre, residents will mainly have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements and capacity such as a northern bypass or link road. New measures will also be required to ensure air quality does not deteriorate.

Full text:

See attached.

Object

Proposed Submission Core Strategy and Policies Development Plan Document Review

Representation ID: 23939

Received: 26/02/2015

Respondent: Mr William Barnes

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

It is unsound to allocate the entire Northern Fringe when its delivery may not be viable over the plan timescales. To lower this risk the CS should include a plan based on co-operating more closely with neighbouring LAs to deliver homes growth. The CS cannot guarantee delivery of the Country Park in a timely manner and so demonstrate it will not adversely affect the integrity of a European designated habitat. For soundness, policy CS10 and Infrastructure Table 8B need to be revised. Allocating the entire Northern Fringe for immediate development through multi-site starts is a high risk strategy that will result in severe traffic congestion for both North Ipswich and the town centre and will damage the future attractiveness and prosperity of town. With so few new jobs being created in the town centre, residents will have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements. In response to a planning application by Mersea Homes /CBRE Global Investors for the first phase of the Ipswich Garden Suburb, Suffolk County Council stated with regard to traffic '... the development has a severe impact on network performance and travel time.' IBC has been pinning their hopes on getting people out of their cars and onto public transport but with so few new jobs being created in the town centre, residents will mainly have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements and capacity such as a northern bypass or link road. New measures will also be required to ensure air quality does not deteriorate.

Full text:

See attached.

Object

Proposed Submission Core Strategy and Policies Development Plan Document Review

Representation ID: 23944

Received: 24/02/2015

Respondent: Mr D Walker

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

It is unsound to allocate the entire Northern Fringe when its delivery may not be viable over the plan timescales. To lower this risk the CS should include a plan based on co-operating more closely with neighbouring LAs to deliver homes growth. The CS cannot guarantee delivery of the Country Park in a timely manner and so demonstrate it will not adversely affect the integrity of a European designated habitat. For soundness, policy CS10 and Infrastructure Table 8B need to be revised. Allocating the entire Northern Fringe for immediate development through multi-site starts is a high risk strategy that will result in severe traffic congestion for both North Ipswich and the town centre and will damage the future attractiveness and prosperity of town. With so few new jobs being created in the town centre, residents will have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements. In response to a planning application by Mersea Homes /CBRE Global Investors for the first phase of the Ipswich Garden Suburb, Suffolk County Council stated with regard to traffic '... the development has a severe impact on network performance and travel time.' IBC has been pinning their hopes on getting people out of their cars and onto public transport but with so few new jobs being created in the town centre, residents will mainly have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements and capacity such as a northern bypass or link road. New measures will also be required to ensure air quality does not deteriorate.

Full text:

See attached.

Object

Proposed Submission Core Strategy and Policies Development Plan Document Review

Representation ID: 23951

Received: 24/02/2015

Respondent: Mrs Anne Walker

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

It is unsound to allocate the entire Northern Fringe when its delivery may not be viable over the plan timescales. To lower this risk the CS should include a plan based on co-operating more closely with neighbouring LAs to deliver homes growth. The CS cannot guarantee delivery of the Country Park in a timely manner and so demonstrate it will not adversely affect the integrity of a European designated habitat. For soundness, policy CS10 and Infrastructure Table 8B need to be revised. Allocating the entire Northern Fringe for immediate development through multi-site starts is a high risk strategy that will result in severe traffic congestion for both North Ipswich and the town centre and will damage the future attractiveness and prosperity of town. With so few new jobs being created in the town centre, residents will have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements. In response to a planning application by Mersea Homes /CBRE Global Investors for the first phase of the Ipswich Garden Suburb, Suffolk County Council stated with regard to traffic '... the development has a severe impact on network performance and travel time.' IBC has been pinning their hopes on getting people out of their cars and onto public transport but with so few new jobs being created in the town centre, residents will mainly have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements and capacity such as a northern bypass or link road. New measures will also be required to ensure air quality does not deteriorate.

Full text:

See attached.

Object

Proposed Submission Core Strategy and Policies Development Plan Document Review

Representation ID: 23958

Received: 02/03/2015

Respondent: Miss Peggy Royce

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

It is unsound to allocate the entire Northern Fringe when its delivery may not be viable over the plan timescales. To lower this risk the CS should include a plan based on co-operating more closely with neighbouring LAs to deliver homes growth. The CS cannot guarantee delivery of the Country Park in a timely manner and so demonstrate it will not adversely affect the integrity of a European designated habitat. For soundness, policy CS10 and Infrastructure Table 8B need to be revised. Allocating the entire Northern Fringe for immediate development through multi-site starts is a high risk strategy that will result in severe traffic congestion for both North Ipswich and the town centre and will damage the future attractiveness and prosperity of town. With so few new jobs being created in the town centre, residents will have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements. In response to a planning application by Mersea Homes /CBRE Global Investors for the first phase of the Ipswich Garden Suburb, Suffolk County Council stated with regard to traffic '... the development has a severe impact on network performance and travel time.' IBC has been pinning their hopes on getting people out of their cars and onto public transport but with so few new jobs being created in the town centre, residents will mainly have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements and capacity such as a northern bypass or link road. New measures will also be required to ensure air quality does not deteriorate.

Full text:

See attached.

Object

Proposed Submission Core Strategy and Policies Development Plan Document Review

Representation ID: 23968

Received: 03/03/2015

Respondent: Mrs Frances Crane

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

It is unsound to allocate the entire Northern Fringe when its delivery may not be viable over the plan timescales. To lower this risk the CS should include a plan based on co-operating more closely with neighbouring LAs to deliver homes growth. The CS cannot guarantee delivery of the Country Park in a timely manner and so demonstrate it will not adversely affect the integrity of a European designated habitat. For soundness, policy CS10 and Infrastructure Table 8B need to be revised. Allocating the entire Northern Fringe for immediate development through multi-site starts is a high risk strategy that will result in severe traffic congestion for both North Ipswich and the town centre and will damage the future attractiveness and prosperity of town. With so few new jobs being created in the town centre, residents will have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements. In response to a planning application by Mersea Homes /CBRE Global Investors for the first phase of the Ipswich Garden Suburb, Suffolk County Council stated with regard to traffic '... the development has a severe impact on network performance and travel time.' IBC has been pinning their hopes on getting people out of their cars and onto public transport but with so few new jobs being created in the town centre, residents will mainly have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements and capacity such as a northern bypass or link road. New measures will also be required to ensure air quality does not deteriorate.

Full text:

See attached.

Object

Proposed Submission Core Strategy and Policies Development Plan Document Review

Representation ID: 23969

Received: 03/03/2015

Respondent: Mr Ian Crane

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

It is unsound to allocate the entire Northern Fringe when its delivery may not be viable over the plan timescales. To lower this risk the CS should include a plan based on co-operating more closely with neighbouring LAs to deliver homes growth. The CS cannot guarantee delivery of the Country Park in a timely manner and so demonstrate it will not adversely affect the integrity of a European designated habitat. For soundness, policy CS10 and Infrastructure Table 8B need to be revised. Allocating the entire Northern Fringe for immediate development through multi-site starts is a high risk strategy that will result in severe traffic congestion for both North Ipswich and the town centre and will damage the future attractiveness and prosperity of town. With so few new jobs being created in the town centre, residents will have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements. In response to a planning application by Mersea Homes /CBRE Global Investors for the first phase of the Ipswich Garden Suburb, Suffolk County Council stated with regard to traffic '... the development has a severe impact on network performance and travel time.' IBC has been pinning their hopes on getting people out of their cars and onto public transport but with so few new jobs being created in the town centre, residents will mainly have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements and capacity such as a northern bypass or link road. New measures will also be required to ensure air quality does not deteriorate.

Full text:

See attached.

Object

Proposed Submission Core Strategy and Policies Development Plan Document Review

Representation ID: 23986

Received: 02/03/2015

Respondent: Mr Paul Thomas Miles

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

It is unsound to allocate the entire Northern Fringe when its delivery may not be viable over the plan timescales. To lower this risk the CS should include a plan based on co-operating more closely with neighbouring LAs to deliver homes growth. The CS cannot guarantee delivery of the Country Park in a timely manner and so demonstrate it will not adversely affect the integrity of a European designated habitat. For soundness, policy CS10 and Infrastructure Table 8B need to be revised. Allocating the entire Northern Fringe for immediate development through multi-site starts is a high risk strategy that will result in severe traffic congestion for both North Ipswich and the town centre and will damage the future attractiveness and prosperity of town. With so few new jobs being created in the town centre, residents will have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements. In response to a planning application by Mersea Homes /CBRE Global Investors for the first phase of the Ipswich Garden Suburb, Suffolk County Council stated with regard to traffic '... the development has a severe impact on network performance and travel time.' IBC has been pinning their hopes on getting people out of their cars and onto public transport but with so few new jobs being created in the town centre, residents will mainly have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements and capacity such as a northern bypass or link road. New measures will also be required to ensure air quality does not deteriorate.

Full text:

See attached.

Object

Proposed Submission Core Strategy and Policies Development Plan Document Review

Representation ID: 23987

Received: 02/03/2015

Respondent: Mrs Shirley Ann Miles

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

It is unsound to allocate the entire Northern Fringe when its delivery may not be viable over the plan timescales. To lower this risk the CS should include a plan based on co-operating more closely with neighbouring LAs to deliver homes growth. The CS cannot guarantee delivery of the Country Park in a timely manner and so demonstrate it will not adversely affect the integrity of a European designated habitat. For soundness, policy CS10 and Infrastructure Table 8B need to be revised. Allocating the entire Northern Fringe for immediate development through multi-site starts is a high risk strategy that will result in severe traffic congestion for both North Ipswich and the town centre and will damage the future attractiveness and prosperity of town. With so few new jobs being created in the town centre, residents will have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements. In response to a planning application by Mersea Homes /CBRE Global Investors for the first phase of the Ipswich Garden Suburb, Suffolk County Council stated with regard to traffic '... the development has a severe impact on network performance and travel time.' IBC has been pinning their hopes on getting people out of their cars and onto public transport but with so few new jobs being created in the town centre, residents will mainly have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements and capacity such as a northern bypass or link road. New measures will also be required to ensure air quality does not deteriorate.

Full text:

See attached.

Object

Proposed Submission Core Strategy and Policies Development Plan Document Review

Representation ID: 23998

Received: 03/03/2015

Respondent: Mr Frederick Farrow

Legally compliant? Not specified

Sound? No

Duty to co-operate? No

Representation Summary:

It's unsound to allocate the entire Northern Fringe when its delivery may not be viable over plan timescales. How will infrastructure be provided? The CS should be based on co-operating more closely with neighbouring LAs to deliver homes growth. The CS cannot guarantee delivery of the Country Park in a timely manner and so demonstrate it will not harm a European designated habitat. Allowing multi-site starts will result in severe congestion and damage the attractiveness and prosperity of Ipswich. With few new jobs being created in the town centre, residents will have to commute by car to jobs growth sites.

Full text:

See attached.

Object

Proposed Submission Core Strategy and Policies Development Plan Document Review

Representation ID: 24007

Received: 03/03/2015

Respondent: Mr R Mills

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

It is unsound to allocate the entire Northern Fringe when its delivery may not be viable over the plan timescales. To lower this risk the CS should include a plan based on co-operating more closely with neighbouring LAs to deliver homes growth. The CS cannot guarantee delivery of the Country Park in a timely manner and so demonstrate it will not adversely affect the integrity of a European designated habitat. For soundness, policy CS10 and Infrastructure Table 8B need to be revised. Allocating the entire Northern Fringe for immediate development through multi-site starts is a high risk strategy that will result in severe traffic congestion for both North Ipswich and the town centre and will damage the future attractiveness and prosperity of town. With so few new jobs being created in the town centre, residents will have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements. In response to a planning application by Mersea Homes /CBRE Global Investors for the first phase of the Ipswich Garden Suburb, Suffolk County Council stated with regard to traffic '... the development has a severe impact on network performance and travel time.' IBC has been pinning their hopes on getting people out of their cars and onto public transport but with so few new jobs being created in the town centre, residents will mainly have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements and capacity such as a northern bypass or link road. New measures will also be required to ensure air quality does not deteriorate.

Full text:

See attached.

Object

Proposed Submission Core Strategy and Policies Development Plan Document Review

Representation ID: 24011

Received: 03/03/2015

Respondent: Mr R Mills

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

The CS cannot guarantee delivery of the Country Park in a timely manner and so demonstrate it will not harm the integrity of a European designated habitat. CS10 and table 8B need to be revised.

Full text:

See attached.

Object

Proposed Submission Core Strategy and Policies Development Plan Document Review

Representation ID: 24014

Received: 03/03/2015

Respondent: Mrs L Mills

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

It is unsound to allocate the entire Northern Fringe when its delivery may not be viable over the plan timescales. To lower this risk the CS should include a plan based on co-operating more closely with neighbouring LAs to deliver homes growth. The CS cannot guarantee delivery of the Country Park in a timely manner and so demonstrate it will not adversely affect the integrity of a European designated habitat. For soundness, policy CS10 and Infrastructure Table 8B need to be revised. Allocating the entire Northern Fringe for immediate development through multi-site starts is a high risk strategy that will result in severe traffic congestion for both North Ipswich and the town centre and will damage the future attractiveness and prosperity of town. With so few new jobs being created in the town centre, residents will have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements. In response to a planning application by Mersea Homes /CBRE Global Investors for the first phase of the Ipswich Garden Suburb, Suffolk County Council stated with regard to traffic '... the development has a severe impact on network performance and travel time.' IBC has been pinning their hopes on getting people out of their cars and onto public transport but with so few new jobs being created in the town centre, residents will mainly have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements and capacity such as a northern bypass or link road. New measures will also be required to ensure air quality does not deteriorate.

Full text:

See attached.

Object

Proposed Submission Core Strategy and Policies Development Plan Document Review

Representation ID: 24020

Received: 03/03/2015

Respondent: Mrs L Mills

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

The CS cannot guarantee delivery of the Country Park in a timely manner and so demonstrate it will not harm the integrity of a European designated habitat. CS10 and table 8B need to be revised.

Full text:

See attached.

Object

Proposed Submission Core Strategy and Policies Development Plan Document Review

Representation ID: 24023

Received: 03/03/2015

Respondent: Mr Stewart Quantrill

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

It is unsound to allocate the entire Northern Fringe when its delivery may not be viable over the plan timescales. To lower this risk the CS should include a plan based on co-operating more closely with neighbouring LAs to deliver homes growth. The CS cannot guarantee delivery of the Country Park in a timely manner and so demonstrate it will not adversely affect the integrity of a European designated habitat. For soundness, policy CS10 and Infrastructure Table 8B need to be revised. Allocating the entire Northern Fringe for immediate development through multi-site starts is a high risk strategy that will result in severe traffic congestion for both North Ipswich and the town centre and will damage the future attractiveness and prosperity of town. With so few new jobs being created in the town centre, residents will have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements. In response to a planning application by Mersea Homes /CBRE Global Investors for the first phase of the Ipswich Garden Suburb, Suffolk County Council stated with regard to traffic '... the development has a severe impact on network performance and travel time.' IBC has been pinning their hopes on getting people out of their cars and onto public transport but with so few new jobs being created in the town centre, residents will mainly have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements and capacity such as a northern bypass or link road. New measures will also be required to ensure air quality does not deteriorate.

Full text:

See attached.

Object

Proposed Submission Core Strategy and Policies Development Plan Document Review

Representation ID: 24029

Received: 03/03/2015

Respondent: Mr Stewart Quantrill

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

The CS cannot guarantee delivery of the Country Park in a timely manner and so demonstrate it will not harm the integrity of a European designated habitat. CS10 and table 8B need to be revised.

Full text:

See attached.

Object

Proposed Submission Core Strategy and Policies Development Plan Document Review

Representation ID: 24032

Received: 03/03/2015

Respondent: Mrs Pamela Plumbly

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

It's unsound to allocate the entire Northern Fringe when its delivery may not be viable over the plan timescales. The CS should be based on co-operating more closely with neighbouring LAs to deliver homes growth.
It is unsound to allocate the entire Northern Fringe when its delivery may not be viable over the plan timescales. To lower this risk the CS should include a plan based on co-operating more closely with neighbouring LAs to deliver homes growth. The CS cannot guarantee delivery of the Country Park in a timely manner and so demonstrate it will not adversely affect the integrity of a European designated habitat. For soundness, policy CS10 and Infrastructure Table 8B need to be revised. Allocating the entire Northern Fringe for immediate development through multi-site starts is a high risk strategy that will result in severe traffic congestion for both North Ipswich and the town centre and will damage the future attractiveness and prosperity of town. With so few new jobs being created in the town centre, residents will have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements. In response to a planning application by Mersea Homes /CBRE Global Investors for the first phase of the Ipswich Garden Suburb, Suffolk County Council stated with regard to traffic '... the development has a severe impact on network performance and travel time.' IBC has been pinning their hopes on getting people out of their cars and onto public transport but with so few new jobs being created in the town centre, resident will mainly have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements and capacity such as a northern bypass or link road. New measures will also be required to ensure air quality does not deteriorate.

Full text:

See attached.

Object

Proposed Submission Core Strategy and Policies Development Plan Document Review

Representation ID: 24038

Received: 03/03/2015

Respondent: Mrs Pamela Plumbly

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

The CS cannot guarantee delivery of the Country Park in a timely manner and so demonstrate it will not harm the integrity of a European designated habitat. CS10 and table 8B need to be revised.

Full text:

See attached.

Object

Proposed Submission Core Strategy and Policies Development Plan Document Review

Representation ID: 24041

Received: 25/02/2015

Respondent: Mrs Davina E Farrow

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

It is unsound to allocate the entire Northern Fringe when its delivery may not be viable over the plan timescales. To lower this risk the CS should include a plan based on co-operating more closely with neighbouring LAs to deliver homes growth. The CS cannot guarantee delivery of the Country Park in a timely manner and so demonstrate it will not adversely affect the integrity of a European designated habitat. For soundness, policy CS10 and Infrastructure Table 8B need to be revised. Allocating the entire Northern Fringe for immediate development through multi-site starts is a high risk strategy that will result in severe traffic congestion for both North Ipswich and the town centre and will damage the future attractiveness and prosperity of town. With so few new jobs being created in the town centre, residents will have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements. In response to a planning application by Mersea Homes /CBRE Global Investors for the first phase of the Ipswich Garden Suburb, Suffolk County Council stated with regard to traffic '... the development has a severe impact on network performance and travel time.' IBC has been pinning their hopes on getting people out of their cars and onto public transport but with so few new jobs being created in the town centre, residents will mainly have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements and capacity such as a northern bypass or link road. New measures will also be required to ensure air quality does not deteriorate.

Full text:

See attached.

Object

Proposed Submission Core Strategy and Policies Development Plan Document Review

Representation ID: 24050

Received: 03/03/2015

Respondent: Mrs Linda Quantrill

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

It is unsound to allocate the entire Northern Fringe when its delivery may not be viable over the plan timescales. To lower this risk the CS should include a plan based on co-operating more closely with neighbouring LAs to deliver homes growth. The CS cannot guarantee delivery of the Country Park in a timely manner and so demonstrate it will not adversely affect the integrity of a European designated habitat. For soundness, policy CS10 and Infrastructure Table 8B need to be revised. Allocating the entire Northern Fringe for immediate development through multi-site starts is a high risk strategy that will result in severe traffic congestion for both North Ipswich and the town centre and will damage the future attractiveness and prosperity of town. With so few new jobs being created in the town centre, residents will have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements. In response to a planning application by Mersea Homes /CBRE Global Investors for the first phase of the Ipswich Garden Suburb, Suffolk County Council stated with regard to traffic '... the development has a severe impact on network performance and travel time.' IBC has been pinning their hopes on getting people out of their cars and onto public transport but with so few new jobs being created in the town centre, residents will mainly have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements and capacity such as a northern bypass or link road. New measures will also be required to ensure air quality does not deteriorate.

Full text:

See attached.

Object

Proposed Submission Core Strategy and Policies Development Plan Document Review

Representation ID: 24056

Received: 03/03/2015

Respondent: Mrs Linda Quantrill

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

The CS cannot guarantee delivery of the Country Park in a timely manner and so demonstrate it will not harm the integrity of a European designated habitat. CS10 and table 8B need to be revised.

Full text:

See attached.

Object

Proposed Submission Core Strategy and Policies Development Plan Document Review

Representation ID: 24066

Received: 03/03/2015

Respondent: Mr David Smith

Legally compliant? Not specified

Sound? No

Duty to co-operate? Not specified

Representation Summary:

It is unsound to allocate the entire Northern Fringe when its delivery may not be viable over the plan timescales. To lower this risk the CS should include a plan based on co-operating more closely with neighbouring LAs to deliver homes growth. The CS cannot guarantee delivery of the Country Park in a timely manner and so demonstrate it will not adversely affect the integrity of a European designated habitat. For soundness, policy CS10 and Infrastructure Table 8B need to be revised. Allocating the entire Northern Fringe for immediate development through multi-site starts is a high risk strategy that will result in severe traffic congestion for both North Ipswich and the town centre and will damage the future attractiveness and prosperity of town. With so few new jobs being created in the town centre, residents will have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements. In response to a planning application by Mersea Homes /CBRE Global Investors for the first phase of the Ipswich Garden Suburb, Suffolk County Council stated with regard to traffic '... the development has a severe impact on network performance and travel time.' IBC has been pinning their hopes on getting people out of their cars and onto public transport but with so few new jobs being created in the town centre, residents will mainly have to commute by car to jobs growth sites. The effectiveness of the Core Strategy to deliver the Ipswich Garden Suburb is doubtful without additional road improvements and capacity such as a northern bypass or link road. New measures will also be required to ensure air quality does not deteriorate.

Full text:

See attached.