ipswich.gov.uk

Ipswich Borough Council Local Plan Core Strategy and Policies Development Plan Document Review - Final Draft

Ended on the 2 March 2020
For instructions on how to use the system and make comments, please see our help guide.

(7)CHAPTER 7: The Key Diagram

7.1 A key diagram is an important part of the Core Strategy and Policies document. It diagrammatically illustrates on a not-to-scale map of the town the spatial strategy set out within Chapter 6 of the document.

7.2 The key diagram illustrates on a simple base map:

(i) The IP-One Area Action Plan area and, within it, the Portman Quarter, Waterfront and Education Quarter (policy CS3);

(ii) Key development locations identified including IP-One, and the District and Local Centres (from policy CS2);

(iii) The approach to Ipswich Garden Suburb as the location of development to 2036 (from policy CS10);

(iv) The cross-border allocation for future development, appropriately phased with the delivery of the Ipswich Garden Suburb and its associated infrastructure, proposed at the northern end of Humber Doucy Lane through policy ISPA4; and

(v) The ecological network, green corridor and green trail approach to strategic green infrastructure (policy CS16).

For instructions on how to use the system and make comments, please see our help guide.
back to top back to top